Repair broken electrical flex line and missing j-box cover plate per annual fire inspection of property. RV Park
INSTALL BACKFLOW PREVENTER ON EXISITING WATER LINE. SHALL COMPLY WITH CITY OF MESA ADOPTED ORDINANCES, CODES AND STANDARDS.
CONSTRUCTION TRAILER & GENERATOR - 5 story building for Cubs baseball team, and 4 story candlewood hotel
Amendment to approved landscape for alternative landscape plan for 40' SRP Easement along North property line
** Big Set** BHSM is seeking to do an approximant 13,000 SF single-story building expansion to add 20-patient rooms and ancillary support spaces to their existing inpatient rehabilitation hospital located in Mesa, AZ. Disciplines included are civil, landscape, structural, architecture, MEPF, and technology. Med gas. Deferred fire sprinklers, fire alarm, access control.
Occupancy verification for an existing 2,475 SF, type VB construction, B occupancy suite. No change to building occupancy use -change from a Fitness/Nutrition business to Day Program for adults with developmental disabilities. Services include life skills training, socialization skills, creative arts, recreational activities, and community support. Building inspection req to verify existing condition. Approved with comments. Results in CoO.
The improvements of the east side of 106th Place
DEVELOPMENT FOR NEW SHELL CONSTRUCTION. THE PROPOSED USES ARE APPROVED USE IN PAD ZONING PER CITY OF MESA DEVELOPMENT CODE. WE ARE PROPOSING CONSTRUCTION OF A SINGLE-STORY BUILDING WITH A TOTAL BUILDING AREA APPROXIMATELY 5,607 S.F. AND OVERHANGS TOTALING 454 S.F. Installation of all off-site improvements and street frontage landscaping during the first phase of construction. Deferred fire sprinklers and fire alarm.
11031 E Gateway Auto Drive DEVELOPMENT FOR NEW SHELL CONSTRUCTION OF A SINGLE-STORY BUILDING WITH A TOTAL BUILDING AREA APPROXIMATELY 6,067 S.F. WITH COVERED PATIO 1,200 S.F. AND OVERHANGS TOTALING 562 S.F. Deferred fire sprinklers and fire alarm.
DEVELOPMENT FOR NEW SHELL CONSTRUCTION. THE PROPOSED USES ARE APPROVED USEIN PAD ZONING PER CITY OF MESA DEVELOPMENT CODE. WE ARE PROPOSING CONSTRUCTION OF A SINGLE-STORY BUILDING WITH A TOTAL BUILDING AREA APPROXIMATELY 5,500 S.F. WITH COVERED PATIO 2,044 S.F. OVERHANGS TOTALING 544 S.F. AND OPEN PATIO 400 S.F. Deferred fire sprinklers and fire alarm.
DEVELOPMENT FOR NEW SHELL CONSTRUCTION. THE PROPOSED USES ARE APPROVED USE IN PAD ZONING PER CITY OF MESA DEVELOPMENT CODE. WE ARE PROPOSING CONSTRUCTION OF A SINGLE-STORY BUILDING WITH A TOTAL BUILDING AREA APPROXIMATELY 6,220 S.F. WITH COVERED PATIO 980.50 S.F., DRIVE THRU CANOPY 246 S.F. AND OVERHANGS TOTALING 433.30 S.F. Deferred fire sprinklers and fire alarm.
DEVELOPMENT FOR NEW SHELL CONSTRUCTION OF A SINGLE-STORY BUILDING WITH A TOTAL BUILDING AREA APPROXIMATELY 6,113.5 S.F. WITH DRIVE THRU CANOPY 253 S.F. AND OVERHANGS TOTALING 563.32 S.F. Deferred fire sprinklers and fire alarm.
DEVELOPMENT FOR NEW SHELL CONSTRUCTION. THE PROPOSED USES ARE APPROVED USE IN PAD ZONING PER CITY OF MESA DEVELOPMENT CODE. WE ARE PROPOSING CONSTRUCTION OF A SINGLE-STORY BUILDING WITH A TOTAL BUILDING AREA APPROXIMATELY 6,121 S.F. WITH COVERED PATIO 350.50 S.F. DRIVE THRU CANOPY 246 S.F., AND OVERHANGS TOTALING 562.30 S.F. Deferred fire sprinklers and fire alarm.
Repair damaged stem wall utilizing Glass Fiber Reinforced Polymer Rebar and Structural Repair Mortar. Special inspections required: Concrete construction. Approved as noted. Results in CofC.
Install above ground buildings and structures associated with Phase 02. Foundations and underground utilities for Phase 02 have previously been permitted under PMT24-07723. Other exclusions to this permit review include all pre-engineered metal buildings (PEMBs) located on the phase 02 site. These structures will be permitted through the Arizona Department of Housing (ADOH) and provided to the City of Mesa for fire code review as part of that submittal. Deferred fire sprinklers, fire alarms and
GAS SHUTOFF, PRECATION MEASURE DUE TO A FIRE
Install electrical substation to power Red Hawk Phase 2 Red building. Scope of work includes foundation, structural steel, electrical, and installation of prefabricated metal equipment enclosure. Ref: PMT24-16556 for Civil permit. Special Inspections are required for concrete, soils, steel, anchoring, and electrical installations. Results in CoC.
New Ground up 19,406 gross SF (18,481 net SF) with 1,165 SF of canopy, ALDI retail store, with Civil. V-B construction with M, B, and S-2 occupancy. Walk-in freezers/coolers. Special inspection for structural items. Deferred fire sprinklers, fire alarm, joist and steel roof deck. New (1) 2-inch domestic water meter installed in previously placed meter box. REF: PMT23-18005 Master Developer. Approved with comments. Results in CoO.
Nomaco is looking to install an expanded foam process in an existing building they are leasing. Their process involves the usage of iso-butane to create an expanded foam material. This code study submittal is requesting a code interpretation of the NFPA 58 requirements for liquid LPGas inside of buildings and the provision and requirements needed.
Installation of warehouse racks. Special inspection for post-installed anchors. Results in CoC.
Commercial pool on ground level. Equipment room on ground level and open to air. Artistic Pavers coping and field. White plaster interior finish. Related to PMT26-14909. Results in CoO.
Our units are pre-manufactured, stand-alone, unmanned water vending station typically placed in 2 leased parking spots in a local shopping plaza. Local review & inspection is primarily on the foundation and utility connections.
13,000 SF LUNCH TENT WITH GENERATOR ELECTRIC. JE Dunn is looking to install a 164’ X 82’ lunch tent. In the location show on the site map. The tent will be onsite for approximately 180 days. There will be two generator powering the electric to the lunch tent. Once completed, and no later than 180 days, the tent will be disassembled and returned to the leasing company.
Install an Emergency Responder Radio Coverage System (ERRCS), including signal booster, donor antenna, indoor antennas, distributed antenna system components, coaxial cabling, and associated equipment to provide required emergency responder radio coverage. Approved with stipulations.
Temporary job trailer for new commercial building PMT25-11698
The scope of this project consists of constructing a new Boeing warehouse facility and associated improvements.
AFP26-14602 Electrical: dock door power relocation,RWAY006A relocation Dojo Welder Removal and relocation refrigerant reclaim equipment (2) test bench power supplies Plumbing: natural gas piping to dojo area cold water extension to dojo area removal of existing piping to existing dojo location that is being relocated. compressed air piping to line 1 work station refrigerant piping extension to line 1 refrigerant fill stations. distribution piping for line 1 refrigerant reclaim piping system. ex
Solar PV Roof-mount, 23.600 kW 40 modules
Installation of solar photovoltaic energy generation system on fuel island canopy(ies), including trenching to back exterior wall of store for feeder conductors to utility line side interconnection
INSTALL BACKFLOW PREVENTER ON EXISITING WATER LINE. SHALL COMPLY WITH CITY OF MESA ADOPTED ORDINANCES, CODES AND STANDARDS.