Search Permits
208,163 results
unit 18: remodel bathroom and kitchen like for like, plumbing stays the same, rewire the apartment, paint and repair walls and ceiling as needed. update plumbing and electrical. nov# 200676850, 200670826, 200671107, 200560763.
unit #4: remodel kitchen inkind, replacement of countertops and cabinets. replace bathroom vanity in kind.
inkind kitchen and bathroom remodel. refresh sheetrock & insulation @ 2 bedrooms on 2/f. (use 5/8" gyp-x)
to obtain final inspection for work approved under pa# 200510064883. all work is complete.
to obtain final inspection for work approved under pa# 201812057521. all work is complete.
11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) floor, opening, structural supports, associated revisions to partition, ceiling and lighting and finishes. 2-hr separation and smoke control
to obtain final inspection for work approved under pa 201106208466, 201210111802, 201302130175. all work is complete
installation of a new two way communication signal system in a 100% affordable housing project with priorty permit processing under mayor's executive directive ed 13-01. ref pa# 202305057244.
installation of a new fire alarm and detection system. in 100% affordable housing project with priority permit processing under mayor's executive directive ed 13-01. ref pa# 202305057244.
building d-remove and replace doors visible from street located on private decks within the same opening. . painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only.
building e-remove and replace all doors visible from street located on private decks within the same opening. . painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only.
building c - remove and replace all doors visible from street located on private decks within the same opening. painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only.
reroof of entire building. insurance requested re-slope to eliminate ponding. torch down.
13th and 14th flr. new tenant, convenience stairs between 13th & 14th floors, work includes new floor opening, structural supports, associated revisions, ceiling & lighting & finishes
building a- remove and replace all doors visible from street located on private decks within the same opening. . painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only.
building b-remove and replace doors visible from street located on private decks within the same opening. doors will be aluminum. painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only.
to comply with nov #202656830. new concrete work in backyard with drains measuring approx. 40x30
g/f only: add laundry room. at (e) family room - add kitchenette with 2 burner cooktop and replace sliding door in (e) frame. at (e) exercise room - replace window in (e) frame, remodel full bathroom with addition of window and conversion of tub to shower.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
to obtain final inspection for work approved under pa 201308235160, 201805108750, 201910043584. all work is complete.
remodel kitchen in kind, new wire and plumbing updates.
second floor kitchen remodel including relocation of kitchen sink to peninsula, relocation of fridge to adajacent closet alcove, non structural demo of closet wall, new cabinets, countertops, lighting, electrical and plumbing work
remove part of entry walll, install structural support beam. new kitchen and 2 bathrooms remodel . new tankless water heater
store front replacing 2 windows street facing in kind, no interior work, no work at public right of way, window u-factor max 0.58.
garage floor- (n) iron frence enclosure for (e) parcel delievery area
reroof hot works
like for like bathrooms remodels x 2. like for like kitchen remodel
like for like bathroom remodel. like for like kitchen remodel.
barrier removal, bathroom restoration
install a wall within the tunnel entrance for extra security at entryway.