Construct new two-family dwelling (S Duplex) per plan. (Establish use as one duplex and one single family residence per land use code. Construct one new two-family dwelling and one new one-family dwelling per plan. Review and processing for two records under 7105821-CN)
Construct temporary alterations (Vendor Installations) at Lumen Field for 2026 FIFA World Cup event (6/15 - 7/6) per plan
Construct alterations to existing one family dwelling subject to field inspection (STFI).
[ADMINISTRATIVE RECORD - FOR INSPECTIONS PURPOSES ONLY] Construct temporary alterations (in stadium hospitality) at Lumen Field for 2026 FIFA World Cup event (6/15 - 7/6) per plan
Allow housing for one new stacked dwelling unit within an existing structure per land use code. Construct alterations and addition for a two-family dwelling per plan.
Construct deck replacement for exiting deck per STFI
to comply with physical inspection report#cc-8740, condo conversion building permit-no work required
to obtain final inspection all work approved under pa#: 201812067663, 202009184473, and 202002134429.
ti to pge substation building including int renovations to 1700 sf for a new ocarea, hddlbreak area and rrs. upgrades to mechanical, electrical, and break area, rrs. upgrades to mep. ext improvements include replacement ofoverhead garage door, accessible entry and pot and van access parking.
revision to pa 2025.0508.6065: remodel of (e) bathrooms, (2) bathrooms upstairs, (1) downstairs. remodel kitchen, breakfast room, and plumbing in laundry room.
plumbing plan review only for storm water control plan. ref pa #202306059259
kitchen remodel, removal of old sheetrock, install insulation, new electrical recessed lighting, 20amps circuit braker (7total) 1 circuit braker is 15amps, all new 5/8" sheetrock, new kitchen cabiinets ad counters, new floors. replacing of 3 windows (uf<=0.27). (not street visible). all in kind.
repair rear stairs and deck less than 50% in-kind. (not visible from the street)
exterior backyard improvement include demo of (e) backyard & construction of (n) retaining walls w/ fence, (n) backyard hardscape, (n) side gate, and site draininge. build a storage shed less than 100 sq.sf.
#101: comply w/ nov #202651630: obtain permit for fire damage restoration. remodel kitchen, bathroom & bedroom. remove/replace w? 5/8 "type x" gyp bd. replace all window in-kind.
reroofing rear side. fear off down to original wood sheet and install one ply certainted diamond deck synthetic as new underlayment and 40 years asphalt shingles. landmark pro. no hot work.
upgrade (e) fire alarm system with a new wireless fire alarm system a like-for-like basis. install low frequency sounders in all sleeping areas to comply with sffc 1103.7.6.1 and sffd ab #3.08 section 5.
to obtain final inspection for work approved under pa#'s 202411275868, 202410102738 and 202103045870. all work is complete.
install insulation in 2 bedrooms outside walls, bathroom remodel, change tiles, vanity, new tub, new toilet.
unit #a: kitchen remodel; remove existing cabinets, countertop, sink etc. after rough electrical and plumbing - drywall installation, install new cabinets, countertop, sink, etc.
recommencment and completion of work approved under pa# 201803143611, 201808026279, 201802272392
recommencement and completion of work approved under pa# 202501027622.
bathroom remodel, change tiles, new tub, paint bathroom, no plumbing or electrical work to be completed. all same location like for like.
unit 261: to comply with nov 202655930: floor vinyl replacements, ney drywall installation, and paint unit. all work interior.
comply w/ nov 202547608 in-kind repair of e) concrete retaining walls in rear yard
unit 1020: to comply with nov 202655930: replace flooring whole unit, drywall and paint for one wall in kitchen area, save lower cabinets.
unit 281: to comply with nov 202655930: demo everything to studs of first and 2nd flrs of units. replace sheet rock.
unit 1028: to comply with nov 202655930: remove and repair flooring in kitchen area, repair drywall throughtout the unit.
kitchen remodel like for like, new cabinets and counter tops.
revision to 202511139490. minor floor plan adjustments, revised elevator door configuration, and resulting structural updates.