Search Permits
245,623 results
2026/10/22 - 2026/10/25 | The Pinnacle of Motorsports returns to COTA.
2026/10/22 - 2026/10/25 | The Pinnacle of Motorsports returns to COTA.
Express: Foundation repair - install 10 push piers
ePlan: Commercial Expedited Review - Interior Remodel to Existing 5th Floor- New Inpatient Units with NCCU and Universal Care Beds (372026 SF).
Express: Replacing 3 windows (like for like)
Solar installation at 5973 Hi Line Rd SHM Emerald Point.
Install 13 zones of irrigation system of 1inch pvc pipe at a new gas station being built
Replacement of complete existing central heat and air system with or without duct work
Install Sprinkler System
new motorized sliding vehicular gate and steel fence at existing multifamily site with underground electric for gate operator and fire access per sheet A1.01. No building area no change of use.
7 DAY - renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C)
Express: Foundation repair-install 14 push piers
New construction 2 story SFR with 3 bed 2.5 bath and front covered porch
Replacement of complete existing central heat and air system with or without duct work
We submitted this application for the permit for meter upgrade/ replacement. I thought we had provided everything we needed but now its missing entirely from the ABC portal so we are starting again.
Subfloor sanitary sewer system repairs accessed via tunnel excavation
2026/10/22 - 2026/10/25 | The Pinnacle of Motorsports returns to COTA.
Building 2 sewer drain lines repairs after building being lifted.
UFCU Scofield Sign E01 Front Elevation
Bldg 2 New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Carport
Installing EV charger in garage. 50 amp hardwired.
>EV Charger Install...roposed installation plan: Install a new 60A circuit in the 80A subpanel and route wiring to the charger location Hardwire the Rivian Wall Charger to the right of panel on the right interior garage wall and configure to draw up to 48A continuous Replace the existing NEMA receptacle with the industrial-rated EVSE-ready NEMA receptacle provided by Treehouse.
Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1)
Twelve Thirty Club - Wall Sign South
install Spectrum CCTV Cabinet
2026/10/22 - 2026/10/25 | The Pinnacle of Motorsports returns to COTA.
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - Autofill/Heated Pool.
2026/10/22 - 2026/10/25 | The Pinnacle of Motorsports returns to COTA.
60amp 240 volt circuit added. No meter work. AE is electrical provider.