Search Permits
202,236 results
R-4 OCCUPANCY GROUP CONDITION 2. Community Residence Registration Application and Certificate of Occupancy for residential care home operating as a licensed Residential Assisted Living Home. Name: Jones Family Care Home. Mesa Zoning Code 11-31-14 limits the number of residents to 10. No skilled nursing services allowed. 24-hour care. R-4 Occupancy Group Condition 2. MBC 310.5. This occupancy condition shall buildings, structures or portions thereof for more than five but not more than 10 persons
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AN
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR CHARGEPOINT HOME FLEX HARDWIRED VEHICLE CHARGER OUTSIDE OF THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
Roadway, drainage, and traffic improvements to build out Elliot Road from the East Maricopa Floodway to Ellsworth Road.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
TAYLOR MORRISON #4036 NEW 2409 SF OR 2433 SF TWO STORY RESIDENCE WITH A TWO CAR GARAGE AT HAWES CROSSING. INCLUDES WATER, ELECTRIC AND GAS METER. SPECIAL INSPECTIONS FOR STRUCTURAL COMPONENTS AND POST TENSION SLABS. SEE MST23-15591 FOR STRUCTURAL CHANGES AT PARCEL A, B AND E. SHEET E1.1 . ADDENDA MST24-18643 - REVISED LIGHTING AT DINING: SHEET A1.2 REVISED 2050 SH WINDOW TO 2040 SH AT ELEVATION E: SHEETS A1.1 & E1.1 REVISED LOCATION OF A/C UNIT: ADD PARCEL H STRUCTURAL SHEETS TO PLAN SET. REF
PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE F
Development of 26,515 SF pre-engineered metal hanger building with 7 bays. Hanger 110: 3706 SF Type II-B construction, group S-1 occupancy. 2hr masonry wall separating (3) fire areas with 2hr east exterior wall. REF: PMT22-16896 main permit. Results in CoO.
Converting a 576 SF detached garage into an ADU. Included Mechanical, Plumbing and Electrical improvements.
New addition of 59 SF at front of existing garage. Type V construction. R5 occupancy. No deferred items. No special inspections.
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
Development of 26,515 SF pre-engineered metal hanger building with 7 bays. Hanger 119: 3679 SF Type II-B construction, group S-1 occupancy. 2hr masonry wall separating (3) fire areas with 2hr east exterior wall. REF: PMT22-16896 main permit. Results in Coo.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
New electric Sub-panel being installed inside the garage behind the existing main service panel. The subpanel will be a125A. All work to be done per the 2023 NEC, 2024 IRC, and Mesa amendments.
The scope of this project is a tenant improvement to an existing shell space. Work to include build out of one new spec office suite and all associated mechanical, plumbing, and electrical. Deferred fire sprinklers. This permit is to obtain a C of C.
Guest bathroom tub-to-shower replacement with no structural changes.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 26-FT.4-IN X 64-FT 2026 GROUND SET CLAYTON COPPER RIDGE MH SET, WITH A/C AT REAR. NO GAS. NEW ELECTRICAL 200AMP PEDESTAL ONE 18-FT X 18-FT ATTACHED AWNING PER ICC NO. 1953. ACCESSORY STRUCTURE ROOF AREAS DO NOT EXCEED THE 100% MH FLOOR AREA. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MINIMUM OF TWO 9-FT X 18-FT PAVED UNOBSTRUCTED PARKING SPACES ARE REQUIRED BEHIND FRONT SETBACK AND REQUIRED TO BE ON 2-IN ASPHALT OR 4-IN CONCRETE. ONE
Development of 26,515 SF pre-engineered metal hanger building with 7 bays. Hanger 101: 3686 SF Type II-B construction, group S-1 occupancy. 2hr masonry wall separating (3) fire areas with 2hr east exterior wall. REF: PMT22-16896 main permit. Results in Coo.
TAYLOR MORRISON #3538 - New 2358 SF 2 story residence with a 2 car garage at Hawes Crossing. Includes new water, electric and gas meters. Special inspections for post tension slabs See MST23-15069 for parcel a,b,d,e,at Hawes Crossing. Addenda MST25-01484 - removed jump duct: · added CO/SD detector - Add Parcel H & F - Revise Parcel A & D information -Revise Parcel B & E Information
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
CONSTRUCTION OF 266 SQ FT ADDITION UNDER AWNING WITH CEILING JOISTS, ELECTRIC AND PLUMBING FOR BATHROOM, WASHER AND RYER ON RAISED DECK. NEW 74 SQ FT EXTERIOR DECK. ACCESSORY STRUCTURE ROOF AREAS DOES NOT EXCEED THE 100 PERCENT OF THE PM FLOOR AREA. MINIMUM ONE 9-FT X 18-FT UNOBSTRUCTED PAVED PARKING SPACE REQUIRED BEHIND FRONT SETBACK ON 2-IN ASPHALT OR 4-IN CONCRETE. 35-FT X 50-FT INTERIOR LOT. MINIMUM SETBACKS 7-FT FRONT, 5-FT REAR, 3-FT SIDES. ACCESSORY STRUCTURE SHALL BE REMOVED WITHIN 60 D
Development of 26,515 SF pre-engineered metal hanger building with 7 bays. Hanger 116: 3694 SF Type II-B construction, group S-1 occupancy. 2hr masonry wall separating (3) fire areas with 2hr east exterior wall. REF: PMT22-16896 main permit. Results in Coo.
PERMIT IS ONLY FOR THE INSTALLATION OF THREE TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE
Gas line repair. The existing regulator was replaced and pressure was verified by the contractor. All work to be verified by the inspector in the field.
Development of 26,515 SF pre-engineered metal hanger building with 7 bays. Hanger 104: 3704 SF Type II-B construction, group S-1 occupancy. 2hr masonry wall separating (3) fire areas with 2hr east exterior wall. REF: PMT22-16896 main permit. Results in Coo.
Construct a 332-sf swimming pool & 42-sf spa with natural gas heat. Installation of 60-ft of 2-in PE gas line buried 18-in deep with 18-gauge tracer wire from gas meter to 400K BTU pool heater. All gas lines are to be installed per 2024 IFGC & SW gas requirements. SW gas to determine if the meter needs to be upgraded or no spa/no gas. All electrical to comply with 2023 NEC requirements. This permit does not include any accessory structures. Registered structural professional engineer: Jesse Ligh
Replace existing 200 Amp electrical panel with one-in-all panel and dig 4 x 4 x 4-foot pit for new 2.5-inch electrical riser for new panel. No new electrical loads associated with this permit.
CONSTRUCTION OF 272 SQ FT ADDITION WITH ELECTRIC AND PLUMBING FOR BATHROOM, WASHER/DRYER AND 80 SQ FT STORAGE ON RAISED DECK AND A COVERED 126 SQ FT DECK. AWNING ENGINEERING PROVIDED BY CARL PUTNAM NO. 39702, EXPIRES 9-30-27. MINIMUM ONE 9-FT X 18-FT UNOBSTRUCTED PAVED PARKING REQUIRED BEHIND FRONT SETBACK ON 2-IN ASPHALT OR 4-IN CONCRETE. 35-FT X 50.5-FT INTERIOR LOT. ACCESSORY STRUCTURES DO NOT EXCEED 100 PERCENT OF THE PM FLOOR AREA. ACCESSORY STRUCTURES SHALL BE REMOVED WITHIN 60 DAYS OF REM
Development of 26,515 SF pre-engineered metal hanger building with 7 bays. Hanger 113: 3709 SF Type II-B construction, group S-1 occupancy. 2hr masonry wall separating (3) fire areas with 2hr east exterior wall. REF: PMT22-16896 main permit. Results in Coo.