Search Permits
245,623 results
Overlay existing roof with Duro-Last. No tear-off or structural alterations. Existing garage.
Install Level 2 EV Charger
Total demolition of 4200 multi-family building circa 1963. The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.
Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1)
Total demo of sfr 986 sqft circa 1953
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office to create corridor and renovate elevator lobby on 3rd floor.
Replacement of complete existing central heat and air system with or without duct work Like For Like 2.5 ton vertical heat pump
New construction build - single family house the attached garage and carport covered porch and outdoor living area 4/3.5
Replacement of complete existing central heat and air system with or without duct work
New attached covered screened patio approx. 595 sq ft total (380 sq ft screened + 215 sq ft open) located on north/backyard side of house. Hip roof structure approximately 11-12ft peak height with 36 overhang on open sides. Includes new concrete slabs electrical extension from existing panel. Structure does not encroach into P.U.E. which is 32.5ft from the rock wall/property boundary
2026/10/22 - 2026/10/25 | The Pinnacle of Motorsports returns to COTA.
Sport Clips Illuminated Channel Letters
Change of use from duplex into SFR. Conversion of existing garage into habitable space.
Service Panel Upgrade
New pool
Overview Provide dedicated GFCI protected branch circuit for business neon pole sign. Install wire raceway in hard pipe for entirety of run from exterior panel on Salado St. to sign location on Rio Grande. Details Install IMC on back of lower concrete block wall which runs across restaurants outdoor garden area. Transition to Schedule 80 PVC for approx 20ft under gravel garden pedestrian entrance and then transition back to IMC for remainder of run along block wall terminating at lockable NEMA
2026/10/22 - 2026/10/25 | The Pinnacle of Motorsports returns to COTA. BP to cover Main Grandstand Activations: Tecovas Amex Pepsi Zero Ka Chava eight sleep Amex Radio
New pool spa and concrete deck utilize existing equipment and gas/electric lines
2026/10/22 - 2026/10/25 | The Pinnacle of Motorsports returns to COTA.
T-Mobile is swapping our radios on existing cell tower; no change to tower height or compound size. 2026-129679 DA.
re-roof_(c)
mechanical_permit_(r)
electrical_permit_(c)
occupancy_permit_(r)
re-roof_(r)
re-roof_(c)
gas_test_permit_(r)
re-roof_(r)
generator_permit_(r)
re-roof_(c)