Search Permits
245,623 results
Replacement of an existing water heater
Sub panel relocation
Replacement of complete existing central heat and air system with or without duct work HVAC change out
New inground spa w/ reqd enclosure device. Revision 1: Decreased length of pool by 2 Moved/detached spa and enlarged it. Added more 3 sheer descent.
Replacement of complete existing central heat and air system with or without duct work Like for LIke 4 ton 2 stage gas horizontal w/supply plenum
Replace sewer yard line and section of sewer line under home by creating an approx 10ft tunnel.
Replacement of complete existing central heat and air system with or without duct work Monica Smith(4)
New pool and spa
7 DAY - Replacing (1) existing AHU with (2) new AHUs (two 8040s) per Munters at existing retail. - OVA
Inspections for solar shingles. No express BP or Aux required as this is new construction. Bluebonnet Electric.
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [2bed 3.5bath] with Attached Garage. Bldg 2
New pool and spa with concrete deck for existing SFR
Unit 16 - New two-story detached single family residence. (3) bedroom (2.5) bathrooms attached 1 car garage. Floor plan type: The Roosevelt C-L-Elevation Option 2. Building Height 24ft-8 5/8in. Maximum Height 30ft. Site Plan #: SP-2020-0393CSH. Expiration Date: 04-13-2025
Install Level 2 EV Charger
Remodeling of an existing interior tenant finish-out from an existing retail space. [15-25 Day Review]
Installing a new irrigation system
2026/10/22 - 2026/10/25 | The Pinnacle of Motorsports returns to COTA.
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 4bath] with Attached Carport.
T-Mobile is upgrading tower equipment at existing cell tower. No change to tower height or compound size.
Upgrade of existing service to relocate outside of enclosed area per Ryan Mabin ***relocating existing service to get it out of the building per AE-Hyatt*** 120/240v 400amp 3phase CT service on Rack.
Bldg 2 New construction of a 3-Story Duplex Unit 2A [4bed 3.5bath]
Express: Foundation repair
Replacement of an existing water heater 40 Gallon Electric Water Heater Replacement
Requesting permit for 150amp service
Install Level 2 EV Charger
Adding on a new master bedroom a new master walk in closet a new master bathroom a new utility room a new office/flex room. Total square footage being added on is 1505sqft. Heated square footage 964sqft and un-heated 541sqft.
*PARTIAL DEMO OVER 50%* ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [4bed 4bath] Work to include: Partial demolition of the existing structure. Addition and remodel to the lower level and first floor New bed New baths [5bed 6.5bath] New wood decks and New driveway strips.
New install
Carson Creek - Roof Sign
Adding Pool and Spa to existing Single Family Residence (SP Condo)