Search Permits
13,383 results · type: plumbing
Alterations
EZ Bathroom & Kitchen Remodel
Alterations
Install outside undergound fireline
New construction of SFR Condo with 3 beds 2.5 baths and attached 2 car garage
Replacement of an existing water heater repalce tankless water heater
Second generation tenant improvement converting an existing pizza shop into a ramen shop. No change in zoning use. The scope of work includes a new interior layout and associated mechanical electrical and plumbing improvements. The existing grease trap shall remain.
Express: Tub to shower conversion in master bathroom Replace tile walls
Excavate a tunnel beneath the residence to access and replace existing cast iron piping with new PVC piping in accordance with local plumbing code requirements.
Install Irrigation System ETJ
Excavate 15 tunnel to repair main drain line under the house.
Interior remodel of existing mercantile space.
Expedited Review - Addition to existing 2-story single family residential to include addition to 1st and 2nd floors Remodel to include removal of stairs walls and windows.
replace water heater and prv
ETJ news service for SFR
16 ft tunnel. The tunnel is for sewer. The tunnel will be located front right side when facing the house by the clean out. Tunnel went 3-inch mainline broken pipe.
Express: Tub to shower conversion in master bathroom Replace tile walls
Replacing sewer line
Install Irrigation System ETJ
Install Irrigation System ETJ
City Sewer Cutover only.
Callahan 830-P-L Is a New one-story single family residence with (4) bedrooms (2) bathrooms an attached two-car garage and a covered entry porch and patio.
Irrigation system
1522 SF First tenant Generation Finish Out for a convenience store NO KITCHEN
Making connection to existing wastewater line & installing pipe from connection to 5 outside proposed building
New Irrigation installation ref 2024-160847 BP ref 2025-075230 W
Replacement of an existing water heater
Express: bathroom tile replaced in both bathrooms exchanged fixtures like for like replace 3 windows sizes to remain same. add smoke detectors install new sewer clean out in front of of house new smoke detectors throughout home new decorative lights fixtures remove popcorn ceiling and retexture
outdoor kitchen gas line
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA