Plumbing 4 Toilets, 6 Lavs, 4 tub/showers, 1 WH Gas, 1 Kitchen Sink, WM, Sewer and Water main lines
1689 SANDTOWN RD SW, ATLANTA, GA 30311
Permit Details
- Permit Number
- BP-202602704
- Type
- Plumbing
- Status
- issued
- Issued Date
- July 6, 2026
- County
- City of Atlanta, GA
Parties
No contractor listed
About Plumbing Permits in GA
0
Plumbing permits in GA
Other Permits in ATLANTA, GA
Rough-In/Set 3 Bathroom group, 1 Kitchen, 1 Laundry Station and 1 hot water heater
2618 BAKER RIDGE DR NW · BP-202602727
CFP is to add and relocate sprinklers off of existing wet system to meet NFPA 13 requirements
10 10TH ST NE · BP-202602724
Adding New plumbing Fixtures to Suite.
3060 PEACHTREE RD NW · BP-202602734
Add plumbing for full bath renovation
613 GLENWOOD PL SE · BP-202602733
add and relocate sprinkler heads to code (old BP-202402623)
675 WEST PEACHTREE ST NE · BP-202602731
Similar Plumbing Permits
plumbing
Norfolk, VA · P26-01872
plumbing
Norfolk, VA · P26-01873
plumbing
Norfolk, VA · P26-01868
Guest bathroom tub-to-shower conversion with 60x34 preformed shower base, no drain relocation, no structural changes. Wall system to 84-inch height. Teak seat installation included. Vanity/countertop replacement with countertop, sink, faucet, and mirror replacement at existing SFR.
Mesa, AZ · PMT26-11223
Installation of 50-ft of 2-in galvanized gas line, surface mounted on wall up to attic, 75-ft of 2-inch CCST inside attic, 15-ft of 2-inch galvanized piping, surface mounted from outside attic down to existing 400k BTU pool/spa heater. All gas lines are to be installed per 2024 IFGC & COM gas requirements. Contact COM gas engineering at 480-644-2909 to determine if the meter needs to be upgraded.
Mesa, AZ · PMT26-04683
About Plumbing Permits in ATLANTA, GA
What is a Plumbing permit?
A Plumbing permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In City of Atlanta, GA, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from City of Atlanta, GA's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.