Search Permits
2,758 results · type: commercial
OTC MODIFY THE EXISTING FIRE SPRINKLER MONITORING SYSTEM TO ADD MONITORING OF (1) NEW ADDRESSABLE DUCT DETECTOR.
Place Fiber Vault and Stub in ROW
NEED TO REPLACE 6" BACKFLOW SER# X10713 LOCATED ON NE PROPERTY OUTSIDE NEAR CELL TOWER.
Development of 229,416 SF, Type II-B construction, groups B and S-1 occupancy single story data center. The development building is designed with tilt wall construction. The building will have supported chiller cooling platforms on south and north side of the buildings. Special Inspections Req - Emergency Responder Radio Coverage IFC 510. Special inspection required - Fire -Resistance Penetration and Joints, concrete, steel, masonry, anchors & bolts, soils, hi-pot testing. Deferred - stairs & pl
Power Plus will provide and install (1) 600A 120/208V 3PH U/G SES to match utility source to provide temporary power to job site.
Modify existing fire alarm system by installing new panels and devices, which includes fire alarm control panels, NAC extension panels, initiating devices, notification appliances, smoke sensors standard and with sounder, addressable modules, duct smoke detectors, remote test stations, waterflow/tamper monitoring, and kitchen hood suppression system monitoring.
Development of new 58,356SF, type II-B, type B and S1 occupancy automotive sales and service facility. Civil improvements and landscape included. Special inspection req - soils, concrete, masonry, steel, bolts and anchors, EIFS, Elect HiPot. Deferred: steel joists, curtain wall system. Deferred fire alarm, fire sprinklers, racking for tire storage, vehicle access gates, open web steel joists, curtain wall system, lift anchorage. Water Meters: (2) 2-inch Domestic and (1) 2-inch Landscape. Approve
The improvements of the east side of 106th Place
Construction of a new 343 SF commercial swimming pool at the existing Fairfield Inn, including pool shell, pool equipment/plumbing, accessible pool entry, pool deck, and associated pool barrier modifications. Pool support building, shower, canopy/ramada, and other building improvements are permitted separately. Building permit PMT25-07835. Reviewed as noted. Results in CoC.
Grade and pave area with new asphalt. Renovate retention area. Results in CoC.
Install self-contained hood and fryer system with Ansul Fire Suppression System consisting of one 3-gallon tank supporting (11) flow points.
Building E. New single-story building, 42,757 SF, type II-B construction, S-1 occupancy conditioned self-storage building. Special inspections req. - Anchors, Steel, concrete, masonry, cold form steel light frame construction. Deferred fire sprinklers and fire alarm. REF: PMT25-11653 for plumbing fixture code modification. Results in CofO.
New multi-tenant shell retail shop and associated site work. Type V-B construction with 4,702 SF tenant space and 1,003 SF of canopy. 2-hour rated wall separation from grocer building. Civil and landscape under PMT25-11661. (5) new electric meters, water meters under civil permit. Deferred fire sprinklers and fire alarm. Special inspection for structural items and electrical service 1000 amps or more. New gas meter added under PMT25-16590A. Results in a CoC.
Modify existing fire alarm system by adding (3) horn/strobes.
Install a new fire alarm system consisting of an addressable fire alarm control panel, (2) 12V batteries, and communicator with (1) photoelectric smoke detector, (1) pull station, (5) ceiling-mounted horn/strobes, (2) ceiling-mounted strobes, tamper and water flow switches, and various modules supported by a new notification appliance circuit. Approved as noted.
POTHOLING utilities for design and discovery
Project Tahoe Phaes 1 is one of multiple phased project executions to the existing facilities and the site the Fujifilm Electronic Material, Inc. This phase consists of expanding their production cabilities with the addition of offloading and purification lines. These lines are complimented with unloading pump foundations and utility rack, electrical infrastructure upgrades, a stainless steal unloading enclosure, minor HVAC upgrades, removal of an existing overhead door and infilling with fire r
Ansul Suppression system install: Related to PMT24-21905
The Biorubber Process Research Center (BPRC) facility includes a Baler Room where product is transferred from a process area into an adjacent area used for weighing, packaging, and electrical controls. To improve personnel safety and maintain separation between these spaces during abnormal operating conditions, this project will construct a new reinforced concrete masonry unit (CMU) partition wall within the existing Baler room. The new wall will create a permanent physical separation between th
New C of O. Looking to request a new Certificate of Occupancy to change the category from Category E to Category B.
Fire Alarm Dialer: Installation of a fire alarm dialer with up to 5 devices – no plans required. Installation shall comply with the City of Mesa codes (IFC, NEC and NFPA 72). Fire inspection required.
Commercial pool on ground level. Equipment room on ground level and open to air. Artistic Pavers coping and field. White plaster interior finish.
new 1200A Distribution board fed from existing distribution board. (2) 600A (2) 100A (3) 30A testing disconnects with camlocks.
INSTALL BACKFLOW PREVENTER ON EXISITING WATER LINE. SHALL COMPLY WITH CITY OF MESA ADOPTED ORDINANCES, CODES AND STANDARDS. Replacing 1/2-inch backflow device serving soda machine.
25'X55' semi-commercial swimming pool & spa w/pool & spa equipment. (2) lp gas heaters & (2) electric heat pumps. CMU equipment room & bathroom. 2000 gal under ground lp tank w/gas line to heaters & bbq. Water & electric to equipment room under separate permit.
AAA Smart Home to replace defective fire alarm control panel and fire alarm radio/communicator with a new fire alarm control panel and fire alarm radio/communicator. With added smoke detectors. All other existing device remain as is.
Install two steel carports approx. 18'x62'x8'2" clear to cover twelve spaces and match existing carports on site
- Add new SES location per plans
Replacing the spa filter pump. This includes wiring and plumbing.
Install Starlink Fire Alarm Cellular Radio for monitoring the Elevator