Search Permits
199,472 results
Hawes Crossing Village 5 - 270 Single family homes - improvement plans. (2) 1-ph Elect Meter, (1) 1.5-inch landscape meter, (261) 1-inch domestic meters to be set with Phase 1, Phase 2 and Model phase homes. Special inspection req. - epoxy anchoring, masonry, steel, soils, concrete. Results in CoC.
Install (2) two non-illuminated monument signs, 4'8" to copy PECOS 17 11 sq. ft. each Signs located out of right of way and easements.
Remodeling with addition: Two existing 2-story suites, type V-B construction, Groups B and F1 occupancy, Suite 102 at 2,985 SF. Modification include demo of existing interior walls, restrooms and ceiling for new office, and restroom layout. Additionally, new second level mezzanine with 648 added SF. Structural and MEP included. Special inspection require for anchors. No changes to occupancy or exterior elevations. Building footprint unchanged. Deferred fire sprinklers. Results in CofO.
New 4-story, type V-A construction, 93,270 SF, Groups R-2 and S-1 occupancies, 88-unit multi-family building. Special inspections: steel, concrete, masonry, wood, anchors, fire-resistant penetrations & joints, and 1,000 amp electrical equipment. Deferred submittal: floor and roof trusses, steel stair, guardrails and handrails, fire sprinklers, fire alarms, and access control. Water meters: (1) 2-inch Domestic. Ref: PMT24-16677 for Phase I. Ref: PMT25-21729 for Phase II commercial building. Ref:
Main bathroom remodel: Demo existing tub and surround, then install 60-inch × 34-inch low-profile left-drain preformed shower base, 84-inch high shower wall surround, brushed-nickel shower valve/trim with handheld, four corner shelves, two 18-inch and one 24-inch grab bars, teak fold-down seat, and 76-inch high ¼-inch tempered rain-glass sliding doors. No structural change.
Converting tub to tub at existing SFR. Replacing pan, drain, and valves. No change to overall square footage.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit. Project Address: 2430 E Huber St Mesa AZ ROC 366120 Utility Company: SRP Job #t3718274 The objective of this project is to perform a code-compliant, like-for-like replacement of an
Install one LED illuminated pan channel letter sets and logo to flush mounted to front fascia of suite LAUNDRY MINT 55 sq. ft. Signs shall be installed per NEC 2023 with UL listed components.
Install two Illuminated pan channel Letters on south and west elevations ZEITOUNA 63 sq ft and 26 sq ft. Signs shall be installed per NEC 2023 with UL listed components.
Installation of LED illuminated front lit pan channel lettersets & logo to front fascia of suite NEURO & BRAIN 54 sq. ft. Signs shall be installed per NEC 2023 with UL listed components.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Renovations at existing mercantile. New architectural, electrical, and plumbing. New partition walls to create pet wash room. New plumbing water lines and waste lines connected to (2) new pet wash tubs. New fuel fired tankless water heater for pet wash room. New light fixture at pet wash room. New wall mounted step transformer and new interior 100A electrical panel. New electrical receptacles at cashwrap station. New electrical drops for LED fixtures. Results in CofC.
Install (2) dedicated 20 amp circuits to back shed, all work done per the 2023 NEC.
Remodel a section in garage to a pool bathroom. Existing slab, add walls, plumbing, HVAC, and reconfigure existing electrical.
Temporary site power for new buildings (PMT24-11833 and PMT24-2195). New 800A 3 phase electrical meter. Approved as noted. Results in CofC.
Work includes demolition of existing interior walls, finishes, doors and frames, millwork. electrical, light fixtures, plumbing fixtures, and mechanical returns and diffusers.
New 4-story, type V-A construction, 93,270 SF, Groups R-2 and S-1 occupancies, 88-unit multi-family building. Special inspections: steel, concrete, masonry, wood, anchors, fire-resistant penetrations & joints, and 1,000 amp electrical equipment. Deferred submittal: floor and roof trusses, steel stair, guardrails and handrails, fire sprinklers, fire alarms, and access control. Water meters: (1) 2-inch Domestic. Ref: PMT24-16677 for Phase I. Ref: PMT25-21729 for Phase II commercial building. Ref:
Install (1) Set of Non-Illuminated Reverse Pan channel Letters
SHEA HOMES #4026 - New 3133 SF two story residence with a 2+ car tandem garage in AVALON CROSSING. New gas, water and electric meters. Special inspection for pot tensions slabs
Remodeling with addition for existing type V-B construction, Groups B and F1 occupancy, 4,737 SF. Modification include demo of existing interior walls, restrooms and ceiling for new office, and restroom layout. Additionally, new second level mezzanine with 714 added SF. Plans include structural and MEP. Special inspection require for anchors. No changes to occupancy or exterior elevations. Building footprint unchanged. Deferred fire sprinklers. Results in CofO.
Expanding out 29 SF and converting to a kitchen. Also updating the roof over the adjacent master bathroom to match style of home. Includes minor mechanical, plumbing and electrical improvements.
Remodel - Residential home stem wall repair – 2 ft at back wall - 6 ft at right side back corner - 5 ft right side right side front corner - 2 ft - 8 inches at front bay
Non-lit reverse pan channel letters, installed flush to exterior wall CYCLIC MATERIALS 79.92 Sq Ft.
Manufacture and install illuminated sign ATTIC LOGO NEEDLEWORK WHERE SAMPLERS RULE 16 sq ft. Signs shall be installed per NEC 2023 with UL listed components.
TI of a 1,651 SF suite, type V-B construction, B occupancy. Interior work including, new offices, bathroom, shower, washer and dryer, MEP's, and finishes. Results in CoO.
Please do not request inspections under this permit until 2 business days after permit issuance.Install disconnects for a replaced AC and air handier with hot water coil
building
building
building