Remodeling with addition for existing type V-B construction, Groups B and F1 occupancy, 4,737 SF. Modification include demo of existing interior walls, restrooms and ceiling for new office, and restroom layout. Additionally, new second level mezzanine with 714 added SF. Plans include structural and MEP. Special inspection require for anchors. No changes to occupancy or exterior elevations. Building footprint unchanged. Deferred fire sprinklers. Results in CofO.
1810 N ROSEMONT, Mesa, AZ
Permit Details
- Permit Number
- PMT26-10464
- Type
- other_commercial
- Status
- issued
- Issued Date
- June 9, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Synectic Design
About other_commercial Permits in AZ
0
other_commercial permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
Adding a attached Bath addition
2726 E DOWNING CIR · PMT26-11467
New single-story 400 SF livable detached ADU. Type V-B construction. Deferred truss calculations. No special inspections. Minimum required building inspections: Plumbing underground, footing, stem, strap/shear, frame, mechanical rough in, electric rough in, plumbing rough in, insulation, drywall shear, mechanical final, electric final, plumbing final and final.
944 S MACDONALD · PMT26-11504
Onsite grading, drainage, paving, utilities, landscaping, street lights, structural, and site electrical. Scope includes base of new monument sign for water feature and shade structure. Special inspection for steel, concrete, masonry, and soils. New (1) 2-inch landscape meter, (1) 3/4-inch water feature meter, (2) electric meters, and (1) gas meter. Deferred electric vehicle gate. Results in CoC.
Unknown · PMT26-10520
Installation of storage racks scope area of 191,364 SF in existing 353,600 SF, type VB construction, B and S-1 occupancy cold storage warehouse. Special inspection req for anchoring. REF: PMT24-10017 PH I and PMT24-11533 PH II. Results in CoC.
8959 E WARNER RD · PMT26-07672
Similar other_commercial Permits
Replacement of (40) RTUs on an existing 223,631 SF, construction type V-B Walmart. Scope includes structural modifications required and update to associated electrical. Special inspection for steel. Approved as noted. Any modifications to the fire protection systems will require a separate submittal. 2018 IFC 901.2. Results in CoC.
Mesa, AZ · PMT26-02448
Replace existing 5 meter combo with New Meter combo listed on the SRP Pre approved charts
Mesa, AZ · PMT26-07988
Remove existing sand (3,321 SF) and sidewalk 80 (SF) at an existing City of Mesa park. New ADA ramp, french drain, sidewalk, park benches, steel fencing, and playground surfaces. New light pole and electrical provided for light at future canopy. Existing electrical meter and panel 100A. Playground equipment and canopy to be installed under separate permits. Results in CoC.
Mesa, AZ · PMT26-06811
Parking Lot Expansion
Mesa, AZ · PMT26-12884
Foundation-only permit for a new top-running bridge crane rail system. Scope includes new reinforced concrete footings and associated anchorage. Crane rail support structure and baseplates will be a separate permit. Special inspection for soils, concrete and post-installed anchoring. Reviewed as noted. Results in CoC.
Mesa, AZ · PMT26-12243
About other_commercial Permits in Mesa, AZ
What is a other_commercial permit?
A other_commercial permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.