Search Permits
245,623 results
ePlan: Commercial Expedited Review - Remodel Two Bungalows- Scope of work to Include Exterior rehab Interior Demolition Addition to Include Connecting Bungalows into a Single Shell for Future Restaurant (2920 SF).
*Green Building*SMART Housing* New construction single-family attached 2-story 3 bedroom 2.5 bath with covered front porch.
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 3.5bath] with Covered Porch and Attached Carport. 514 E MONROE ST
Retroactively seeking permit for unpermitted work for a converted carport. The carport was converted into additional space for the living/dining area. We will need to get this work inspected for the owners can receive their Certificate of Occupancy.
Express - Reroof
New 1-story single family dwelling with 4 bedrooms and 3.5 baths 3 car garage rear patio and front porch.
New construction of 2 story SFR Condo 3 beds 2.5 baths 2 car garage PUD
ePlan: Residential Expedited Review - New Autofill/Heated pool. 514 E MONROE ST (143sf).
*Partial Demo* Interior remodel
Replacement of complete existing central heat and air system with or without duct work 2Ton Gas system Replacement
Esparanza S426 D Left New - 1 Story SFR w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
We need to upgrade the existing electrical service as it is an older one that has the frayed exposed wire and a federal pacific panel.
Bldg. 2: New detached dwelling (1br/1ba)
Replacement of complete existing central heat and air system with or without duct work
New construction of 1 story sfr 3 beds 2 baths 2 car garage and covered patio
Install new irrigation in an old existing home.
New 1 Story Detached Garage with alley access
Construct new driveway approach of 12 FT
Suite remodel.
New Construction of a 2 story single-family residence with attached 1-car carport covered outdoor living space with sink counter fireplace and two habitable attics: one on the second floor and the other habitable attic on the third floor . 4 bedroom 5.5 bathroom
Floor 3 and basement. Installation of new server equipment includes limited exterior work for Mechanical and Electrical equipment. Existing business offices.
SP Condo: New construction of 2 story sfr condo - 3 bedrooms 2.5 baths attached garage covered patio
Replacement of complete existing central heat and air system with or without duct work
PB: New construction of 2 story SFR condo 25 bath 3 bedrooms attached garage attached covered patio
Repair the broken 3 PVC sewer line beneath the garage foundation by accessing the damaged area(2ftx2ft) replacing defective piping with Schedule 40 PVC and testing the drain system for leaks.
Replacement of complete existing central heat and air system with or without duct work
Construct new driveway approach of 12 FT
Install new 8kw rooftop solar system and 11.5kw energy storage system for existing residential only
Excavate 15 tunnel to repair main drain line under house
Replacement of complete existing central heat and air system with or without duct work 3Ton gas system replacement