Search Permits
22,643 results · type: plumbing
pulled gas meter [gas pressure test]
Total Demo of SFR 882 sq ft circa 1940;
Sheldon S403 A Left New - 2 Story SFR w/ 3 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Tunnel approximately 10 to replace the section of damaged sewer pipe.
Replacement of an existing water heater Install 40 gal natural gas a.o smith water heater. Includes moving pvc pan drain new shut off valve new 40 gal unit labor and additional materials.
Replacement of an existing water heater WATER HEATER REPLACEMENT
Single Family Residential New Home Construction. 2-Story 4 bedroom with 2.5 bathrooms with 2 car garage and covered patio.
irrigation install
Express: Replace existing wet space with new shower including new valve and prefabricated acrylic walls
irrigation install
Excavate 8 tunnel to repair main drain line under house ALSO INSTALLED NEW GRINDER PUMP
Tunnel under foundation to replumb complete drain system up to bottom of foundation and out to exterior line. Approx 60ft of tunnel.
ePlan: Commercial Expedited Review - [SMART HOUSING] Redevelopment of Existing Site. New Construction of 4- Story Affordable Housing to Include 2 Connected Fire Areas and associated site improvements. Fire Area 2: Includes 20 new dwelling units.
Mercantile Interior renovation of existing tenant space.
Caprock S405 C Left New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Express: Tub to shower conversion
Repairs to sanitary subfloor sewer system accessed via tunnel excavation
Yard water line repair. Sleeved and tracer wire installed. Customer is elderly and needed water so we made the repair and am now trying to get it inspected
Replacement of an existing water heater install water heater
Replacement of an existing water heater Change Out: Install/ Replace 180K BTU tankless natural gas water heater.
tunnel under home up to 15 to expose and replace failed fittings under slab. 2X Tunnel access. Access holes will be located on the front right side of the home and in the back yard on right side of home.
New construction of 2 story sfr 4 beds 2.5 baths 2 car garage covered patio
Replacement of an existing water heater Replace like/like 2 G water heaters.
Gas Test
ePlan: Commercial Expedited Review - [SMART HOUSING] Redevelopment of Existing Site. New Construction of 4- Story Affordable Housing to Include 2 Connected Fire Areas and associated site improvements. Fire Area 1: Includes 90 new dwelling units leasing office and learning center.
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing