Search Permits
198,278 results
ePlan: Expedited Review - New Construction of Pergola - Residential Units.
ePlan: Commercial Expedited Review - Change of Use from Meat Market Butcher shop to Restaurant with Retail and Added New Deck Area (3872 SF)
TEMPORARY TPOLE FOR NEW CONSTRUCTION IN WILDHORSE ref BP: 2026-061422 Blue Bonnet
ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. with Parking Garage - Lake View East - Module D.
ETJ-Emergency-replace meter loop (called out to contractor work is already done will need to upload ESPA prior to final)
Partial replacement of failed cast iron drain piping to Bath 1 &2 and trunk line by tunnel
ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Construct new driveway approach of 17 FT and sidewalk of 131.5 LF
stand alone tpole permit related to 2026-068015 EP
EXPRESS: Water heater replacement window replacement (2 small like for like)
New construction of a 2-story single family dwelling in a condo regime. 3 bedroom 2.5 bath with attached garage
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A577 New 2 story SFR with 4 Bedrooms 3.5 Bath and an attached 2 car garage. FOR RECORD SET SEE: 8002 PONCHO PASS 2025-070719 PR (INCLUDES 23 ADDRESSES.)
Replacement of complete existing central heat and air system with or without duct work **JACKIE DAVIS: Remove and replace existing HVAC unit and install GLXS4024; no structural change.
*Partial Demo* Interior remodel/partial garage conversion two-story SFR
Replacement of complete existing central heat and air system with or without duct work
ePlan: Expedited Review - New Construction of Pergola - Residential Units.
New 2-story SFR with 5 bedrooms 4 bathrooms attached 2-car garage covered entry porch and patio
Gas pressure test and Code upgrades
*SMART Housing* *Green Building* New 1-story 3 bedroom 2 bathroom single family residence with attached garage covered front porch and rear covered patio.
ePlan: Expedited Review - New Construction of Parking Garage - Module D.
Express: Reroofing (located in WUI)
Change of use to personal services with second-gen finish out
Interior remodel Major interior renovation including all new finishes kitchen appliances and cabinetry doors and windows; new plumbing and electrical fixture replacement but no HVAC work.
New construction of 2 story sfr condo with 3 beds 2.5 baths and attached 2 car garage PUD
ePlan: Expedited Review - New Construction of Pergola - Residential Units.
ePlan: Expedited Review - New Construction of Pergola Residential Units.
First time interior remodel of a shell
Replacement of complete existing central heat and air system with or without duct work 1 system: 2 Ton 14 Seer2 Single Stage Condenser evaporator coil and gas furnace
ePlan: Expedited Review - New Construction of Parking Garage - Module M and N.
Install Irrigation System