Search Permits
198,278 results
Retroactive permit. Enclose covered porch conduct interior remodel including replacement and addition of windows bathroom and kitchen remodel replace HVAC unit replace roof shingles and cladding. Build uncovered deck and staircase. (Porch converstion and uncovered deck permits have been sumitted with this application)
Replacement of complete existing central heat and air system with or without duct work Martha Davids: Replace 3-ton like-for-like gas system
Express- Tub to shower replacement (prefab base) in the same location.
ePlan: Commercial Expedited Review - UPS-MV-DH 2-5 -New Installation of Tracking Equipment and Inspection (500 SF)
Construct new driveway approach of 17 FT and sidewalk of 63.5 LF
Replacement of complete existing central heat and air system with or without duct work UNT 94 BLD R REFLECTIONS OF WALNUT CREEK III CONDO
Replacement of two existing boilers within the Palmer Events Center
Updating electrical service ILO ragloop
Replacement of an existing water heater Replace 50-gallon electric water heater Location: garage
HOME BUILDERS LOOP for New SFR COA BP: 2026-041666
Replacement of complete existing central heat and air system with or without duct work SCHUHMACHER
ePlan: Residential Expedited Review - New construction of a TWO-UNIT RES. UNIT 2 2-Story with basement [5bed 5.5bath] with attached Garage/Carport
Install a full lawn sprinkler system.
New Irrigation Installation
ePlan: Expedited Review - New Construction of a Multi-Family Bldg. with Parking Garage - Lake View East - Module A.
NEW 1 STORY SINGLE-FAMILY RESIDENCE 4BEDROOM 2 BATH W/ ATTACHED GARAGE COVERED PORCH AND PATIO.
Interior Non-Structural Demo
Express: Remove and replace 2 windows: like for like no structural changes.
Replacement of complete existing central heat and air system with or without duct work
Tunnel a total of 15 linear feet under slab foundation and repair broken drain line with new pvc pipe.
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 4.5bath] with Attached Garage. Bldg 3
UNIT A: New 2-story 3 bedroom 2.5 bathroom duplex residence with attached carport covered front porch and rear covered patio.
*Green Building* New 2-story 4 bedroom 3.5 bathroom single family residence with attached garage covered front porch and side covered patio.
Tunneling up to 85 feet of building waste drain line to replace existing cast iron with PVC.
UPGRADE MAIN ELECTRICAL SERVICE
ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. with Parking Garage - Lake View East - Module N.
Replacement of complete existing central heat and air system with or without duct work
Addition and Remodel Addition and renovation of an existing one story SFR resulting into a two story 3 bedroom 405 bath
38.88KW Rooftop PV Installation
Install Irrigation System