Search Permits
18,284 results · type: plumbing
APPLICATION HEREWITH FILED FOR NEW PLUMBING WIRK IN CONJUCNTION WITH X01250889-I1. NO CHANGE IN OCCUPANCY, USE, EGRESS OR BULK.
INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF BUILDING.
INTERIOR ALTERATIONS TO APT # 4H. INSTALLATION OF KITCHEN AND BATHROOM FIXTURES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Addition/ remodel to include: Addition to rear of existing 1-story single-family residential to expand the primary bedroom add a primary bathroom and increase the kitchen area; new covered patio; new covered front porch. Interior remodel.
Replacement of an existing water heater UNIT # 8104
Total demo SFR 2164 SqFt circa 1957
Tunnel to repair broken pipe under foundation
Bldg. 2: NEW SECONDARY UNIT WITH 2 BEDROOMS AND 1.5 BATHROOMS
Replacement of an existing water heater 40-gallon natural gas water heater
First-generation tenant build-out of existing shell building for dental office.
New 1-story detached stand-alone bathroom 8x10 single slope roof containing plumbing/electrical.
Total demo of sfr 1100 sqft circa 1960
Installation of underground fireline
ETJ New construction community kitchen 900sqft
7 DAY - Interior remodel of existing office. no access control - OVA
irrigation install
ePlan: Residential Expedited Review - Addition and Remodel to Existing to Existing 1-Story Single Family Res. Interior remodel Conversion of existing garage to living space addition of attached garage addition of unconditioned storage room remodel of existing patio damaged by previous foundation repairs related site development BP 2023-034748 Foundation Repair
Gas company turned off gas because of a leak. we found leak on underground gas line to gas grill. customer said the did not want to replace the line and would just by a propane grill so we disconnected underground line to grill and capped off the line. Pressure tested the sytem and it holds pressure. gas is still off pending permit and inspections
New in ground pool and spa
Replace Dual Check Backflow Preventer at 12405 Bluestone Cir
ETJ New construction community kitchen 900sqft
Remove existing water heater and install new 50 gallon natural gas water heater.
Install Sprinkler System
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [2bed 3.5bath] with Attached Garage. Bldg 2
Total demo of sfr 1500 sqft circa 1939
THIS PROJECT CONSISTS OF RENOVATION ON THE GROUND FLOOR OF THE EXISTING ASCENSION SETON MAIN CAMPUS HOSPITAL TO EXPAND AND MODERNIZE THE EXISTING STERILE PROCESSING DEPARTMENT. ALTERATIONS WILL ALSO EXTEND INTO AREAS AND FLOORS BEYOND THIS DEPARTMENT TO ACCOMMODATE UPDATED MECHANICAL AND EXHAUST SYSTEMS. FLOOR 1 [Phase 3A]
Single Family Residential New Home Construction 1 story 3 bedroom with 2 bathrooms with 2 car garage and covered patio.
Interior Remodel primary bath includes moving plumbing in slab remodel kitchen including moving appliances locations remove fireplace an open wall in kitchen add closet space in garage for primary closet area. (to be include in garage conversion app) Add door to create laundry room
Bldg #2 Convert existing detached garage into 2-story dwelling unit adding second floor framing internally 1-bathroom with loft and living space