Search Permits
2,827 results · type: commercial
Modify existing fire alarm system by adding (4) photoelectric smoke detectors, (3) heat detectors, (5) relay modules, and (1) monitor modules for elevators on 1st and 2nd floor.
Development of new 15,058 SF, type V-B construction, group R-2 and S-2 occupancy, 4-bay Fire and Medical Station with 10 Dorms and site construction. Water meters: 1.5-inch domestic and 1-inch landscape. Special inspection req. - steel, concrete, masonry and anchors. Fire sprinkler system and electric vehicle gates are included in this permit plan set. DEFERRED FIRE SPRINKLERS AND ALARM. Results in CoO.
Four site-built equipment pads, underground telecommunications duct banks, grading, and associated landscape improvements. Prefabricated ME hut structures are not within this scope of work. Temporary mobile generators are not included as permanent site equipment under this permit. Results in CoC.
Install electrical 200A SES and meter for construction site power. New 200A panel with (1) 50A breaker for twist lock outlet. Results in CofC.
Install (4) new steel canopies (1,368 SF total), attached to a new building (PMT25-16974). Results in CofC.
New stand-alone single story building as an accessory building for the church that is in the adjacent building to the east. Contains assembly space, a warming kitchen, storage, and restrooms. The site is a pad. Parking is provided in the existing development. Deferred fire sprinklers and fire alarm.
Modify NFPA 13 fire sprinkler system by replacing sprinkler mains with schedule 40 pipe and adding new air vent due to corrosion.
Modify Ansul hood fire suppression by adding (2) nozzles, adjusting existing nozzles, and adding (1) detection bracket. Field inspection is required to verify that no modifications to the existing electrical or gas systems were made in conjunction with the appliance additions. Approved as noted. Results in CoC.
INSTALL BACKFLOW PREVENTER ON EXISITING WATER LINE. SHALL COMPLY WITH CITY OF MESA ADOPTED ORDINANCES, CODES AND STANDARDS.
Amendment to approved landscape for alternative landscape plan for 40' SRP Easement along North property line
Commercial Building Permit
Occupancy verification for an existing 2,475 SF, type VB construction, B occupancy suite. No change to building occupancy use -change from a Fitness/Nutrition business to Day Program for adults with developmental disabilities. Services include life skills training, socialization skills, creative arts, recreational activities, and community support. Building inspection req to verify existing condition. Approved with comments. Results in CoO.
Repair damaged stem wall utilizing Glass Fiber Reinforced Polymer Rebar and Structural Repair Mortar. Special inspections required: Concrete construction. Approved as noted. Results in CofC.
Install above ground buildings and structures associated with Phase 02. Foundations and underground utilities for Phase 02 have previously been permitted under PMT24-07723. Other exclusions to this permit review include all pre-engineered metal buildings (PEMBs) located on the phase 02 site. These structures will be permitted through the Arizona Department of Housing (ADOH) and provided to the City of Mesa for fire code review as part of that submittal. Deferred fire sprinklers, fire alarms and
GAS SHUTOFF, PRECATION MEASURE DUE TO A FIRE
Install electrical substation to power Red Hawk Phase 2 Red building. Scope of work includes foundation, structural steel, electrical, and installation of prefabricated metal equipment enclosure. Ref: PMT24-16556 for Civil permit. Special Inspections are required for concrete, soils, steel, anchoring, and electrical installations. Results in CoC.
New Ground up 19,406 gross SF (18,481 net SF) with 1,165 SF of canopy, ALDI retail store, with Civil. V-B construction with M, B, and S-2 occupancy. Walk-in freezers/coolers. Special inspection for structural items. Deferred fire sprinklers, fire alarm, joist and steel roof deck. New (1) 2-inch domestic water meter installed in previously placed meter box. REF: PMT23-18005 Master Developer. Approved with comments. Results in CoO.
Nomaco is looking to install an expanded foam process in an existing building they are leasing. Their process involves the usage of iso-butane to create an expanded foam material. This code study submittal is requesting a code interpretation of the NFPA 58 requirements for liquid LPGas inside of buildings and the provision and requirements needed.
13,000 SF LUNCH TENT WITH GENERATOR ELECTRIC. JE Dunn is looking to install a 164’ X 82’ lunch tent. In the location show on the site map. The tent will be onsite for approximately 180 days. There will be two generator powering the electric to the lunch tent. Once completed, and no later than 180 days, the tent will be disassembled and returned to the leasing company.
Install an Emergency Responder Radio Coverage System (ERRCS), including signal booster, donor antenna, indoor antennas, distributed antenna system components, coaxial cabling, and associated equipment to provide required emergency responder radio coverage. Approved with stipulations.
The scope of this project consists of constructing a new Boeing warehouse facility and associated improvements.
AFP26-14602 Electrical: dock door power relocation,RWAY006A relocation Dojo Welder Removal and relocation refrigerant reclaim equipment (2) test bench power supplies Plumbing: natural gas piping to dojo area cold water extension to dojo area removal of existing piping to existing dojo location that is being relocated. compressed air piping to line 1 work station refrigerant piping extension to line 1 refrigerant fill stations. distribution piping for line 1 refrigerant reclaim piping system. ex
Solar PV Roof-mount, 23.600 kW 40 modules
INSTALL BACKFLOW PREVENTER ON EXISITING WATER LINE. SHALL COMPLY WITH CITY OF MESA ADOPTED ORDINANCES, CODES AND STANDARDS.
Commercial Building Permit
Addition of two dog park cells at existing dog park area in City of Mesa park. Install new water fountain and tie water line to existing water fountain supply line. Install new sight lighting and tie into existing electrical meter. Install new chain link fencing and gates. Install (2) 2-inch landscape water services and (2) 2-inch water meters. Results in CofC.
Interior alterations to existing Buildings 1, 4, and 5, including remodel of the existing café in Building 1, interior renovations to Buildings 4 and 5, a 24-sf addition to Building 5, and new steel entry canopies at Buildings 4 and 5 totaling 631 sf. Type V-B construction, A-3 occupancy. Building 5 interior separation wall 2-hour fire-resistance-rated assembly to remain, new code required 1-hour corridor in building 5 North. New grease interceptor. Deferred fire alarm. Special inspection requir
Temporary construction power installation consisting of one 100 kW/125 kVA, 208Y/120V, 3-phase generator supplying a 400A temporary distribution panel, temporary power distribution equipment, two 12-ton A/C units, and associated fire alarm power. Installation includes temporary SOOW feeder cables, grounding and bonding, and associated connections. Temporary installation is limited to 180 days or less. Fire permit FTP26-12869 and alarm PMT26-13549. Results in CoC.
Installation of (3) 16x16x8 detached shade structures per plans at 256 SF each for a total of 768 SF. Structures will have concrete footings, steel columns and roof components and HDPE Fabric Top. Fabric will be Aquatic Blue and columns will be white. Results in CoC.
Installation of CO2 automated fire suppression system for pair of acetone wet benches, within an H occupancy. Related to PMT26-05706 and PMT25-11789. Approved with stipulations. Results in CoC.