Search Permits
191,413 results
Wrecking
Plumbing Permits
Plumbing Permits
Plumbing Permits
Fire Protection Systems
HVAC
HVAC
HVAC
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Existing 10,111 SF construction type II-B, M and S-1 occupancy building. Interior and exterior renovations. Scope of work includes, demolition of storefront glazing, interior partitions, interior finishes, fixtures, furniture. New exterior wall infill, storefront glazing, materials, and finishes. New interior partitions, doors, lighting, and finishes. New egress sidewalk at sales entrance. MEP's, structural, and civil scope. Note: service area and storage mezzanine are not included within this p
TAYLOR MORRISON #3538 - New 2358 SF 2 story residence with a 2 car garage at Hawes Crossing. Includes new water, electric and gas meters. Special inspections for post tension slabs See MST23-15069 for parcel a,b,d,e,at Hawes Crossing. Addenda MST25-01484 - removed jump duct: · added CO/SD detector - Add Parcel H & F - Revise Parcel A & D information -Revise Parcel B & E Information
Tenant improvement of existing 1384 SF, type VB construction, B occupancy suite to add (3) office, (1) hearing test room and (1) lab. Modifications to include associated mech ductwork from exist units and elec power and lighting scope. No structural or plumbing work, no occupancy or parking changes. Less than 10 fire sprinkler heads will be added/relocated. REF: PMT20-19877 Split suite. Results in CoO.
New 2428 SF two-story residence with a two car garage in AVALON CROSSING. New gas, water and electric meter
New Addition and Attached ADU – New 1,365 S.F. addition including a 958 S.F. attached ADU on the 1st and 2nd floors. Remodel of 183 S.F. Addition includes kitchenette, bedroom, and bathroom. Includes 590 S.F. basement addition connected to the main house (not part of the ADU). Remodel includes stairs and office at existing bedroom. Type V construction. R-5 occupancy. No change to existing 3/4 inch water meter. Upgraded electrical panel to 400 amp. Added 200 amp sub. Deferred truss calcs. Special
Tenant improvement of 714 SF, type VB construction, B occupancy restaurant. Modification to include interior partitions to create (1) ADA toilet room, back of house food prep area, serving and point of sales area and guest seating area. New ceiling, plumbing fixtures, new ductwork and diffusers from existing RTU, new elect panel. REF: PMT24-07014 for shell bldg. Results in CoO.
Interior plumbing tenant improvement consisting of the reuse and modification of existing plumbing rough-ins from the previous tenant. Work includes installation of one NSF 3-compartment sink, one prep sink, one service mop sink, one ice well, one reverse osmosis (RO) water treatment system with storage tank, and one commercial ice machine. Existing water supply and sanitary drainage connections will be reused where feasible, with selected existing rough-ins capped and abandoned in place. New pi
Replace existing electrical panel with new 200 amp bus panel and 150 amp main breaker at the same location. Existing underground electrical service to remain. No special inspections. Minimum required building inspections: Electric rough in and electric final.
shade structure at the entry of the house approximately 14' x 16'
PLUMBING PERMIT TO REPLACE EXISTING WET SPACE WITH NEW SHOWER INCLUDING NEW VALVE AND PREFABRICATED ACRYLIC WALLS IN THE HALL BATHROOM. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
adding battery to existing system
396 sf free-standing gazebo (shade structure)
Install (2) face-lit channel letter building signs, each mounted on a backer, on the east and north elevations: NOTHING BUNDT CAKES – 43 SF each. Replace 2 monument sign faces.
LANDSCAPE PLAN WITH GAZEBO/PERGOLA AND SUNKEN SEATING
Existing warehouse building. New electrical interior panel for lighting. Results in CofC.
Installation of a 10 mm double-facing, high-brightness color LED sign on existing base. 48in in H x 72in L x 5in D 120 volt 30.0 AMPS (15 per face) 1" heavy-wall conduit, 12-gauge wires, 18" below grade
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Install 4 120 Gal Vertical Propane Tanks and Run Gas Line to Propane Cookstove. Minimum required building inspections: LPG Gas rough in and final.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE