LIKE FOR LIKE REPAIR/REPLACEMENT OF DAMGED METER, DIRECTION RECEIVED FROM SRP.
Install of site sport amenities: (2) sand volleyball courts, (4) pickle ball court and (2) hot tub spa with prefab support bldg with 6ft fencing and gates. Modified premanufactured spa bldg 320 SF, type IIB construction, group U occupancy. Manual vehicle gates at volleyball courts. Pickleball shade canopy as separate permit. Approved with stipulations. Results in CoC.
potholing utilities for design and discovery
Exterior mechanical and electrical modifications to provide cooling for 47 existing generator/DEF enclosures, 8 ISP electrical cabinets, and 4 Perun transformer control panels. Scope includes new HVAC equipment and associated electrical power. This City of Mesa permit is limited to the site-installed mechanical and electrical work only. Results in CoC.
Widen the existing ingress/egress driveway at the Higley Road access point to a total width of 71 feet.
Install 19.5 ft x 20 ft (390 SF total) pre-engineered aluminum shade cover over patio area at an existing building. Results in CofC.
New multi-tenant shell retail shop and associated site work. Type V-B construction with 7,225 SF tenant space and 1,700 SF of canopy. Civil and landscape under PMT25-11661. (5) new electric meters, water meters under civil permit. Deferred fire sprinklers and fire alarm. Special inspection for structural items and electrical service 1000 amps or more. Results in a CoC.
Emergency Responder Radio Coverage System
Existing warehouse building. New electrical 200A 3 phase meter and interior panel for lighting. Results in CofC.
Interior tenant improvement: remodel of old office spaces, re-configuring interior layout, electrical, plumbing, partition walls, drywall, paint, etc. Deferred fire sprinklers and fire alarm. Special inspections required for screw anchors in concrete and for steel construction. Results in C of C. Ref: PMT24-19511
ELECTRIC PERMIT FOR INSTALLATION OF ELECTRIC METER PEDESTAL FOR TRAFFIC SIGNAL.
FIRE DAMAGE REPORT - FIRE OCCURED 5/5/19 IN THE OFFICE. THE OFFICE WAS TOTALLY DESTROYED. BATHROOM AND LAUNDRY ROOM DAMAGE. manger office (commercial) , office at time of inspection has been gutted to stud, not structural damage, there are 3 room next to office that have water and smoke damage , (note that there room I could not get into) smoke damage to smoke truss and could have spread to other area were ceiling still in place, replace duct work that is damage , must have licensed electri
Lift station for commercial development
New above ground 1000gal fuel tank with new concrete pad, related electrical work, and associated demolition work. Approved with comments. Results in CoC. Approved with Stipulations.
NEW RETAIL BUILDING FOR THE USE OF GOODWILL STORE AND DONATION CENTER ON NEW SHOPPING CENTER DEVELOPMENT LOCATED AT THE INTERSECTION OF GREENFIELD ROAD AND BASELINE ROAD IN MESA,ARIZONA. THIS PROJECT WILL INCLUDE A DRIVE-THRU DONATION LANE FOR RECEIVING DONATIONS. THIS STORE WILL PROCESS THE DONATIONS AND PROVIDE ITEMS FOR RE-SALE TO THE PUBLIC. Per Conditions of Approval of ZON25-00967 Replace all dead or dying landscaping at the parking area and perimeter of the project site. Deferred fire sp
Uograding the well site at 3522 E University Dr
Development of restaurant shell building, Type V-B construction, 2,749SF building with 363 SF covered patio, Group A-2 occupancy. Development includes Civil Site Improvements. Special Inspections Required for Type 1 Hood Grease Duct Wrap, Fabricators, concrete, masonry, steel, anchors and soils. (1) 1.5inch domestic water meter, (1) 3/4inch irrigation meter, (1) 1,312CFH Gas meter, and (1) 3ph Elect meter. Deferred fire sprinklers, fire alarms, Co2 leak detection and hood fire suppression, pre-m
Install Sewer Tap and Sewer Line extension to existing Rest Room at the Sunland Village East R.V. Storage.
Install new domestic 1-inch water meter service line and 1-inch water meter at existing building and connect to existing building (internal) water line. Connection to existing 3/4" water meter along Macdonald to be terminated. Results in CofC.
Remove and replace AFFF foam with new NFF foam. Includes new tank, valves and associate piping. Existing sprinkler heads and associated piping to remain. New hydraulic calculations for updated density requirement for new foam provided. Approved with Stipulations: Per design, a 700-gallon CHEMGUARD bladder tank is required to meet the 633 concentrate gallons needed. 2024 IFC as adopted is the applicable code. City Code, Title 7, Chapter 2
Tenant improvement of existing 28,275 SF type VB construction group E, A3 B and S1 occupancy Boys and Girls Club. Modification of approx. 13,000 SF existing space to include new walls and doors to create various education rooms, admin offices, new reception area, and restroom facilities. Main Gym is separated from remainder of bldg by existing 2hr fire wall. Scope includes building addition of 2,918 SF to provide secure lobby, conference and additional education space. Associated MEP scope: mech
New above ground 1000gal fuel tank with new concrete pad, related electrical work, and associated demolition work. Approved with comments. REF: PMT21-10097 Site Lighting. Results in CoC. Approved with stipulations.
Install new 1000 gallon propane tank and associated equipment for refilling portable tanks at existing hardware store. New concrete pad, bollards, and masonry screen wall. New electrical and structural. Special inspections required: masonry construction. Per approved ADM26-00403 1. Remove two parking spaces along the southwest corner of the building, one for the installation of a new 1,000 -gallon, above-ground propane storage tank. The space directly to the east of the proposed tank will become
New pony chiller and wet side economizer to the existing chiller plant for existing building. New MEP. Special inspections required: concrete construction, expansion bolts, and epoxy anchors. Results in CoC.
Install new cold plunge pool, spa, and associated equipment at new building (PMT24-19616). New structural and electrical. Special inspection concrete construction. Results in CoC.
Install 7 parking canopies totaling 8,905 SF at a new facility. Special Inspections required: concrete construction, welding, and soils. Results in CofC
THIS SUBMITTAL IS FOR CIVIL AND LANDSCAPE PERMIT ONLY TO SEPARATE THE WORK FROM THE NOX DEVELOPMENT PLANS. CONTACT ROBERT APODACA.
add 1200A distribution board from an existing distribution board for several disconnects (2) 600a (2) 100A (3) 30A. For testing of HVAC equipment.
Interior tenant improvement. Deferred fire sprinklers.
Replacement of off-site Streetlight poles on McKellips Rd as Warranty Work due to Manufacturer defects.