Installation Of A 47.52 Kw Roof-Mounted Solar Photovoltaic, 108 Mods.
Installation Of 66.00 Kw Roof-Mounted Solar Photovoltaic (Pv). Includes (150) Hyundai Solar Hin-T440nf(Bk) 440w Modules, (1) Solaredge Se50kus Strin
Installation Of 66.00 Kw Roof-Mounted Solar Photovoltaic (Pv). Includes (150) Hyundai Solar Hin-T440nf(Bk) 440w Modules, (1) Solaredge Se50kus Strin
Installation Of 70.40 Kw Roof-Mounted Solar Photovoltaic (Pv). Includes (160) Hyundai Solar Hin-T440nf(Bk) 440w Modules, (3) Solaredge Se17.3kus Strin
Convert 1200 Sf Poolhouse To A D U. Wall W/ Electrical Was Added To Create Bedroom. (N) Island W/ Induction Burner Was Installed. See B39730
New Exterior Staircase And Landings With Roof Cover
CONSTRUCT A 340 SF SWIMMING POOL & 38 SF SPA WITH NATURAL GAS HEAT. INSTALLATION OF 50-FT OF 2-INPE GAS LINE BURIED 18-IN DEEP WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & COM GAS REQUIREMENTS. COM GAS TO DETERMINE IF METER NEEDS TO BE UPGRADED. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #58912, EXPIRES 12/31/
CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 16-FT X 40-FT 2026 CLAYTON MANUFACTURED HOME ABOVE GROUND SET, SERIAL NO. BUC017860AZ, WITH A/C AT REAR. NO GAS. NO LP TANKS. ONE 11-FT X 35-FT AWNING PER ICCESR 1398 ATTACHED AWNING. ACCESSORY STRUCTURE ROOF AREAS DO NOT EXCEED THE 100% MH FLOOR AREA. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MINIMUM OF TWO 9-FT X 18-FT PAVED UNOBSTRUCTED PARKING SPACES ARE REQUIRED BEHIND FRONT SETBACK AND REQUIRED TO BE ON 2-IN ASPHALT OR 4-IN CO
Hawes Crossing Village 4 is a part of the Hawes Crossing master planned community located northeast quarter of Section 20, Township 1 South, Range 7 East of the Gila and Salt River Meridian. The Project is comprised of approximately 39 net acres planned for single family residential development. Approved with comments. Landscape meter included in Phase 1 under PMT25-03485.
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Replace beverage equipment and associated MEP with new. Demo identified equipment, drains, water lines, refrigeration lines, and floor sinks. Remove power back to electrical panel for demolished equipment. Install new equipment, waste lines floor sinks, water lines, beverage lines, power for new equipment. Replace existing RTU glycol chiller condensing unit with new. Results in CofC
Tenant improvement, 23,000 SF, Group S-1 warehouse converted into Group F-1 occupancy in an existing 108,000 SF, type II-B construction. Modifications include relocating tooling operations: architectural, structural, mechanical and electrical work. Deferred fire sprinklers and fire alarm. Approved with comments. Results in new partial CofO.
New addition of 154 SF livable and 395 non-livable for a game room and covered patio. 326 SF remodel of the existing Arizona room and existing patio. Type V-B construction. No change to utilities. Deferred truss calculations. No special inspections. Minimum required inspections: Footing, stem, strap/shear, frame, mechanical rough in, electric rough in, plumbing rough in, insulation, drywall shear and final. If needed, underground electrical and plumbing.
Addition of new distribution panels HPP5 and HPP6 along with equipment connections from panels
New grey shell tilt up wall building. Group B, F-1, and S-1 occupancies. Type III-B construction. Building 44,856 SF, Canopies 264 SF, Total 45,120 SF. Civil site work. New 2-inch domestic water meter service and water meter. New 1-inch landscape water meter service and water meter. New pluming waste lines with 250 gallon interceptor for (2) trench drains at wash bays and stub ups for future restrooms. New mechanical RTUs. New 1600A 3 phase electrical SES and meter. Special inspections require