Search Permits
4,234 results · type: plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
New sewer service is proposed for 601 S. 92nd St., APN 22070204, located in Maricopa County jurisdiction.
Run gas pipes to a new water heater and a new stove in house. Installing a new gas meter. All piping installation to be per the 2024 IRC, G2415: (404) Piping System Installation.
Demolish existing cultured-marble shower walls, plumbing trim, bathtub, and tub wall surrounds in master bathroom wet area at existing SFR. Install new 34×34 in. Durabath white standard shower pan with Bathguard, 96 in. high Durabath white smooth shower walls, three Durabath white corner shelves, Moen Gibson shower trim, and Livingstone Thundercloud pony wall cap: drywall, texture, and prime 30 sq ft of former tub walls: install customer-supplied curtain rod. Custom glass enclosure to be measure
Replace tub, move drain 22", replace accessible CPVP with plex piping
Replacing hot and cold fresh water pipe in a 2-bathroom house. Previous materials were a mix of copper and Pex and proposed to be replaced with all Pex throughout. Pinhole leaks were found in various spots that warranted replacement of the pipes.
plumbing
plumbing
plumbing
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
RENOVATION OF EXISTING CELLAR, BASEMENT, 1ST AND 2ND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 2-PC RESTROOM, WASHER,DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NEW YARD DRAIN AT FRONT AND REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPA
MODIFICATIONS TO EXISTING PLUMBING SYSTEMS, AS PER PLANS.THIS INCLUDES UPDATES TO BATHROOMS AND FIXTURES, A NEW BEVERAGE BAR, ETC. THIS SCOPE OF WORK DOES NOT CONTAIN ANY MODIFICATIONS TO AN EXISTING GAS SYSTEM.(Box Office/Flatbush Entry/Lobby)
REMOVAL & INSTALLATION OF NEW PLUMBING SYSTEMS THROUGHOUT TWO FAMILY DWELLING UNIT,3-STORY W/BASEMENT & PENTHOUSE AS PER PLAN SHOW.
PLUMBING WORK ON EXISTING RESIDENTIAL HOUSE WITH REPLACE/RELOCATE/NEW KITCHEN AND BATHROOM FIXTURES AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
remove and relocate (1) lavatory, (1) toilet, (1) 3 compartment sink. Install new (1) hand sink and (1) floor sink, Replace (1) electric hot water heater
Plumbing work in conjunction with job #S01393492-I1. No change in use, occupancy or egress.
PLUMBING FIXTURES INSTALLATION FOR ONE FAMILY DWELLING UNIT. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 2-PC RESTROOM, WASHER,DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
PROPOSED PLUMBING WORK IN A NEW SPA ON THE FIRST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INTERIOR WORK IN EXISTING EATING AND DRINKING ESTABLISHMENT (USEGROUP 6). INSTALL NEW ADA BATHROOM ON 1ST FLOOR.
Interior Renovation of Unit 14 with new sink, lavatory, shower, and water closet. No change in use, occupancy, or egress.