Search Permits
18,284 results · type: plumbing
INSTALLATION OF PLUMBING WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
REPLACE GAS TRAIN AND GAS CONNECTION TO REPLACEMENT GAS/OIL BURNER.
PLUMBING MODIFICATIONS TAKING PLACE ON 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
generator gas line
Replace sewer line
Tenant improvement to existing space (formerly CVS) for Dollar Tree. Scope includes updating finishes and fixtures New RTUs at existing locations and MEP work as needed.
Interior Remodel Removal of 1 exterior door and replacement of 1 window combine 2 baths into 1 in primary new plumbing fixtures reconfigure interior walls level foor move W/D replace appliances and sink in kitchen rebuild island remove dropped ceiling Add W/D reconfigure 1 bath including moving plumbing fixtures move doors new HVAC
Water Line Replacement up to 30
Replacement of an existing water heater 50 Gallon Electric Water Heater Replacement
INTERIOR REMODEL TO SPLIT EXISTING BANK SPACE #108 INTO TWO SPACES #100 and #108 AND RETURN TO SHELL.
Interior remodel existing hospital areas. Xray 5
irrigation for lawn
10ft sewer line repair at city sewer line tap
Express - New walk in shower
ETJ - irrigation install
New Construction Office Warehouse Building 3
Total Demo of a SFR 1420sqft built in 1953 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
New construction 2-unit use single-family residential 3-story 3 bedroom 3 bath with covered front porch covered side patio uncovered wood deck 2nd floor covered balcony covered 3rd floor balcony and uncovered roof-top deck.
ePlan: Commercial Expedited Review - Interior Remodel and Change of Use to Personal services Scope of work includes Undemising two suites into a tenant space (6031 SF).
65 trench to replace yard sewer
Total demo of SFR 1080 SqFt circa 1954
Interior Remodel- modernize layout converting family room to bedroom add new bathroom and reconfigure existing laundry area.
New construction 2-unit use single-family residential 1-story studio space with kitchen and full bath.
ePlan: Residential Expedited Review - New Construction of 2-story SF Res [4bed 4.5bath] with attached carport and connecting workshop.
Remodel to pre loss condition: like to like replacement of existing HVAC plumbing electrical and interior finish with no structural modification. Existing multifamily unit.
Remove and Replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls parking sidewalks or landscape.
Total demo of sfr 1048 sqft circa 1942
Subfloor Sanitary Sewer Repair Sewer Yard Line Replacement Bathroom Addition and Subfloor Plumbing with Sewer Pump Sewer Discharge Line and water heater conversion from tank to tankless.
Approx. 35 feet of tunnel under home to repair sewer line with access starting in the front of the home
New SFR 2 - Story 4-bedroom 2.5 bath with attached 2-car garage covered front porch and covered rear patio