PermitDig

Search Permits

11,718 results · type: mechanical

Replacement of complete existing central heat and air system with or without duct work replacement of an hvac system

4811 GERONA DR, AUSTIN
Sep 29

Replacement of complete existing central heat and air system with or without duct work

10214 RUTLAND VILLAGE WEST, AUSTIN
Sep 29

INTERIOR ALTERATION OF APPROX. (6400 SF) OF EXISTING INTERIOR SPACE

2600 VIA FORTUNA UNIT 450, AUSTIN
Sep 29

Tenant improvement to existing space (formerly CVS) for Dollar Tree. Scope includes updating finishes and fixtures New RTUs at existing locations and MEP work as needed.

4001 W WILLIAM CANNON DR, AUSTIN
Sep 29

New 2-story Condo SF Residence 4 bedrooms 3 bathrooms

8316 ROBERT ZION WAY, AUSTIN
Sep 29

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 519

2336 DOUGLAS ST UNIT 519, AUSTIN
Sep 29

Replacement of complete existing central heat and air system with or without duct work

6444 BURNET RD UNIT 209, AUSTIN
Sep 29

Replacement of complete existing central heat and air system with or without duct work

11222 BARRINGTON WAY, AUSTIN
Sep 29

Replacement of complete existing central heat and air system with or without duct work

505 NATALI ST, AUSTIN
Sep 29

mechanical_permit_(c)

651 FROGMORE DR, Baton Rouge
Sep 29

mechanical

840 PHILPOTTS ROAD, Norfolk
0KSep 29

mechanical

1540 VIRGILINA AVENUE, Norfolk
0KSep 29

mechanical

527 STERLING STREET, Norfolk
0KSep 29

mechanical

530 BRIAR HILL ROAD, Norfolk
0KSep 29

mechanical

1071 CLEMENTS AVENUE, Norfolk
0KSep 29

Installation of five Titan outrigger platforms on each floor, from the 5th floor to the 29th floor.

11 WEST 13 STREET, Manhattan
24KSep 29

INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.

460 PARK AVENUE, Manhattan
10KSep 29

Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

49 CHAMBERS STREET, Manhattan
3KSep 29

TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

205 MONTAGUE STREET, Brooklyn
2KSep 29

Installation of temporary overhead protection at courtyard per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

820 5 AVENUE, Manhattan
10KSep 29

HVAC MODIFICATIONS ON THE 22nd AND 23rd FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

1251 AVENUE OF THE AMERICAS, Manhattan
180KSep 29

Installation of ductworks, duct insulations, and air supply outlets only as shown herewith on drawings. No change to use, egress, or occupancy.

584 BROADWAY, Manhattan
125KSep 29

Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

366 MADISON AVENUE, Manhattan
3KSep 29

TEMPORARY ROOF PROTECTION AT ADJOINING PROPERTY (195 MONTAGUE STREET) DURING NB CONST, FILED SEP. TEMPORARY ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

205 MONTAGUE STREET, Brooklyn
2KSep 29

MECHANICAL MODIFICATIONS TAKING PLACE ON 44TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

9 WEST 57 STREET, Manhattan
81KSep 29

SUBSEQUENT FILING FOR MECHANICAL WORK TYPE FOR INSTALLATION OF DUCTLESS SPLIT-SYSTEM HEAT PUMPS FOR HEATING AND AIR CONDITIONING.

100 ATLANTIC AVENUE, Staten Island
10KSep 29

Modifications to the existing HVAC System. Removal of ductwork, piping, controls and equipment back to core on the 1st Floor as per plans (LL Work - Retail Demo.) No change to use, egress or occupancy.

3 BRYANT PARK, Manhattan
34KSep 29

Installation of 1 new 8 ton HVAC unit and associated air handers and new electric heater

25 NAVY STREET, Brooklyn
50KSep 29

#2522 - Direct replacement of roof mounted HVAC on existing dunnage. No change in egress, use, or occupancy.

62 2 PLACE, Brooklyn
30KSep 29

MECHANICAL MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

524 BROADWAY, Manhattan
425KSep 29