Search Permits
11,718 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work replacement of an hvac system
Replacement of complete existing central heat and air system with or without duct work
INTERIOR ALTERATION OF APPROX. (6400 SF) OF EXISTING INTERIOR SPACE
Tenant improvement to existing space (formerly CVS) for Dollar Tree. Scope includes updating finishes and fixtures New RTUs at existing locations and MEP work as needed.
New 2-story Condo SF Residence 4 bedrooms 3 bathrooms
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 519
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
mechanical_permit_(c)
mechanical
mechanical
mechanical
mechanical
mechanical
Installation of five Titan outrigger platforms on each floor, from the 5th floor to the 29th floor.
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of temporary overhead protection at courtyard per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
HVAC MODIFICATIONS ON THE 22nd AND 23rd FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of ductworks, duct insulations, and air supply outlets only as shown herewith on drawings. No change to use, egress, or occupancy.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
TEMPORARY ROOF PROTECTION AT ADJOINING PROPERTY (195 MONTAGUE STREET) DURING NB CONST, FILED SEP. TEMPORARY ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
MECHANICAL MODIFICATIONS TAKING PLACE ON 44TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
SUBSEQUENT FILING FOR MECHANICAL WORK TYPE FOR INSTALLATION OF DUCTLESS SPLIT-SYSTEM HEAT PUMPS FOR HEATING AND AIR CONDITIONING.
Modifications to the existing HVAC System. Removal of ductwork, piping, controls and equipment back to core on the 1st Floor as per plans (LL Work - Retail Demo.) No change to use, egress or occupancy.
Installation of 1 new 8 ton HVAC unit and associated air handers and new electric heater
#2522 - Direct replacement of roof mounted HVAC on existing dunnage. No change in egress, use, or occupancy.
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.