PermitDig

Search Permits

4,234 results · type: plumbing

NEW PLUMBING FIXTURES IN CONJUNCTION WITH ALTERATION, NYC BUILDING CODE 2022, PLUMBING CODE 2022 , GAS FUEL CODE 2022 AND ENERGY CODE 2025

110 82 STREET, Brooklyn
63KJun 30

FILE PLUMBING WORK FOR 1-FAMILY BUILDING WITH NEW/REPLACE/RELOCATED PLUMBING FIXTURES AND GAS APPLIANCES AS PER PLAN. NO CHANGE OF USE, EGRESS, OR CERTIFICATE OF OCCUPANCY.

82-16 257 STREET, Queens
16KJun 30

INSTALL (4) NEW PLUMBING FIXTURES AS PER PLAN FILED HEREWITH. NOCHANGE OF USES, EGRESS OR OCCUPANCY.

41-05 29 STREET, Queens
8KJun 30

FILING FOR GAS REPIPE TO GAS-FIRED APPLIANCES AS PER PLANS.

86-15 101 STREET, Queens
17KJun 30

Exterior storm piping

427 ODER AVENUE, Staten Island
Jun 30

Exterior Storm Piping

429 ODER AVENUE, Staten Island
Jun 30

removal and replacement of existing boiler and HWH with (3) separate direct-vent combination boilers. Installation of 2-piece powder room, hookup for washing machine and dryer

1162 FOX STREET, Bronx
24KJun 30

HEREWITH FILING ALTERATION SUBSEQUENT TO APPLICATION # Q01383050-I1 FOR PLUMBING WORK IN CELLAR, FIRST, SECOND FLOORS AS PER PLANS FILED.

176-25 80 ROAD, Queens
73KJun 30

CAP AND REMOVE EXISTING PLUMBING FIXTURES, INSTALL NEW GAS FIRED EQUIPMENT & PLUMBING FIXTURES AS PER PLANS FOR THIS EXISTING (2) TWO FAMILY DWELLING UNITS FILED IN CONJUNCTION WITH ALT APPLICATION#Q01370643-I1. INSTALL NEW PLUMBING FIXTURES AS PER PLAN.

134-04 FARMERS BOULEVARD, Queens
89KJun 30

CAP AND REMOVE EXIST PLUMBING FIXTURES, INSTALL NEW GAS FIRED EQUIPMENT & PLUMBING FIXTURES AS PER PLANS FOR THIS EXISTING ONE FAMILY DWELLING

94-24 125 STREET, Queens
17KJun 30

Plumbing work in conjunction with the build-out of a retail store.

20 EAST 20 STREET, Manhattan
125KJun 30

JOB FILED EXIST. COMMERCIAL STORE INSTALL NEW COOKING EQUIPMENT AS PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

42-29 BELL BOULEVARD, Queens
21KJun 30

PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01355953-I1

2440 ESPLANADE, Bronx
1KJun 30

Plumbing work file in conjunction with apartment#8A renovation as per plans filed herewith.

590 WEST END AVENUE, Manhattan
20KJun 30

Cap+ remove existing plumbing fixtures cellar-001 per demo plan no change to use egress occupancy. GC, MH,PL,SP for design to be filed separately All in conjunction to Alt1 121204856 where new C of O will be issued. no change to use egress or occupancy

2367 8 AVENUE, Manhattan
20KJun 30

FILE PLUMBING WORK TO LEGALIZE PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

6-28 151 STREET, Queens
Jun 30

PLUMBING WORK TAKING PLACE ON THE 30TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

590 MADISON AVENUE, Manhattan
25KJun 30

Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.

360 PARK AVENUE SOUTH, Manhattan
70KJun 30

FILING FOR PLUMBING WORK INCLUDING INSTALLATION OF NEW PLUMBING FIXTURES, CAP & REMOVAL OF BLACK SANITARY PIPING, AND REPLACEMENT OF PIPING IN ORDER TO RESOLVE VIOLATION #39158306X. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

2127 EAST 7 STREET, Brooklyn
72KJun 30

SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

56-48 EAST HAMPTON BOULEVARD, Queens
70KJun 30

Plumbing modifications taking place on the 4th, 5th, 6th floors as per plans filed herewith. No change in use, egress or occupancy.

125 PARK AVENUE, Manhattan
534KJun 30

modification to plumbing as per plans

245 EAST 87 STREET, Manhattan
Jun 30

PROPOSED PLUMBING WORK AT MEDGAR EVERS COLLEGE PHASE 2- ELECTRICAL DISTRIBUTION UPGRADE- REPAIR OF EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING. PROVIDE NEW SANITARY, WASTE, VENT, HOT AND COLD WATER PLUMBING FIXTURES.

1150 CARROLL STREET, Brooklyn
57KJun 30

Plumbing modifications taking place on the 1st fl, and subcellar as per plans filed herewith. No change in use, egress or occupancy

101 WEST 92 STREET, Manhattan
115KJun 30

PLUMBING WORK IN CONJUNCTION WITH ALT-CO APPLICATION Q01385304-I1

51-12 64 STREET, Queens
18KJun 30

REMOVAL OF PLUMBING FIXTURES AND ASSOCIATED PIPING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.

375 PARK AVENUE, Manhattan
7KJun 30

EXISTING TWO-FAMILY HOUSE WITH PLUMBING WORK AT CELLAR, 1ST, 2ND FLOOR. JOB FILED TO RELATED TO ALT-2APPLICATION # B01400073-I1. ILLEGAL REAR EXTENSION TO BE DEMOLISHED AND RESTORED TO PREVIOUS DESIGN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.

1526 HART PLACE, Brooklyn
12KJun 30

Interior renovation of an existing residential apartment. No changes to use, occupancy, egress, building envelope, structure, or construction classification. Scope is limited to interior work only no exterior work proposed.

365 BRIDGE STREET, Brooklyn
10KJun 30

Plumbing work as shown on the plans submitted herewith. No changes to use egress or occupancy as of right.

416 WEST 118 STREET, Manhattan
15KJun 30

PLUMBING WORK IN CONJUNCTION IN ALT GC

100 WEST 58 STREET, Manhattan
58KJun 30