Search Permits
11,718 results · type: mechanical
New construction 2-unit use single-family residential 3-story 5 bedroom 5 bath (4 full 2 half) craft room 2 offices covered front porch and covered patio.
ePlan: Residential Expedited Review - New construction of a 1-Story Duplex [1bed 1bath]. Unit 1B
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 ton horizontal gas
Replacement of complete existing central heat and air system with or without duct work Like for like 4 ton 2 stage gas
ePlan: Commercial Expedited Review - Interior Remodel to Existing Medical Office for IT Room. (150000 SF).
Replacement of complete existing central heat and air system with or without duct work Like for like 2 ton lennox gas horizontal
Change of use to retail auto parts store with tenant fitout.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5T vertical Heatpump (upstairs)
Rerouting ducts of heat pump water heaters in all 2 and 3 bedroom units 92 units total. Remove ducts into unit interior and replace with ducts to wall to exterior corridor with fire damper vents.
New SFR 2- Story 3 bedroom 3 bath with attached 2-car garage covered front porch and covered rear patio PUD
mechanical
mechanical
mechanical
mechanical
mechanical
INSTALLATION OF A TEMPORARY LOADING DOCK AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. LOADING DOCK SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION AND USE OF TEMPORARY GANTRY BEAM AND TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
FURNISH AND INSTALL ALL LABOR, MATERIALS, EQUIPMENT, AND APPLIANCESREQUIRED FOR A COMPLETE AND OPERATIONAL HVAC SYSTEM AS DESCRIBEDHEREIN AND INDICATED ON THE CONTRACT DRAWINGS.
Installation of temporary material hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
PROPOSED INSTALLATION OF DEBRIS CHUTE AS PER PLANS. CHUTE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
OFFICE RENOVATION WORK TO INCLUDE MECHANICAL MODFICATIONS AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PROPOSED INTERIOR RENOVATION, INSTALLATION OF SPLIT AC UNITS ON 2ND FLOOR(APT. #2F,2R), REMOVED EX. OIL TANK AND GAS BOILER ON CELLAR. CEILING, FLOORING & PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work