Search Permits
244,860 results
Approximately 790 SF structure , 1 Bedroom,1 Bathroom with 208 SF non livable custom built in trussing covered patio cover. 9' Ceilings. Exterior finishes and roof tile will match the existing house.
New construction of a 1,114 SF, type VB construction, group B occupancy Dutch Bros Coffee Stand with 834 SF of Canopy for (1) drive-thru window and (1) walk-up service window. No indoor seating or interior access to the public. Site development include a small parking area, (2) drive aisles and a trash enclosure. Special inspection req for Masonry, Wood and Soils. Exist 2-inch domestic meter to be relocated. Deferred Roof trusses. Deferred fire sprinklers and CO2 monitoring. Results in CoO.
Tenant improvement in existing 2,756 SF, type I-A construction, B-occupancy suite in a 3-story Desert Medical Campus bldg. Modification include new interior partition and ceilings to create (5) exam rooms, (2) procedure rooms for outpatient procedures/treatments, (2) office, a nurse station, breakroom, reception and waiting area and (2) ADA restroom. Scope to include replacement of existing in ceiling heat pumps and associated mech duct, plumbing and elect power and lighting. Deferred fire sprin
TAYLOR MORRISON #3538 - New 2358 SF 2 story residence with a 2 car garage at Hawes Crossing. Includes new water, electric and gas meters. Special inspections for post tension slabs See MST23-15069 for parcel a,b,d,e,at Hawes Crossing. Addenda MST25-01484 - removed jump duct: · added CO/SD detector - Add Parcel H & F - Revise Parcel A & D information -Revise Parcel B & E Information
New 2406 SF single story residence with a 2 car garage at AVALON CROSSING. Includes a new water, electric and gas meter. Includes an option of a tandem garage
Remove and replace equipment at existing cell tower site. Results in CoC.
Lofts @ Pioneer Crossing Homebuilding LLC master plan two-story triplex, R-5 occupancy, one- & two-facility dwelling. Plan1 livable at 1725 and nonlivable at 564, Plan2 livable at 1770 and nonlivable at 574, Plan3 livable at 2055 and nonlivable at 554. Water service 1 inch with 3/4 or 1-inch meter. 200 amp panel electric service. Deferred truss calcs. Fire sprinklers required: submit as an addenda. Special inspection for post tension, epoxy anchors, and soils grading and drainage. EV charger. R
Lofts @ Pioneer Crossing Homebuilding LLC master plan two-story triplex, R-5 occupancy, one- & two-facility dwelling. Plan1 livable at 1725 and nonlivable at 564, Plan2 livable at 1770 and nonlivable at 574, Plan3 livable at 2055 and nonlivable at 554. Water service 1 inch with 3/4 or 1-inch meter. 200 amp panel electric service. Deferred truss calcs. Fire sprinklers required: submit as an addenda. Special inspection for post tension, epoxy anchors, and soils grading and drainage. EV charger. R
Lofts @ Pioneer Crossing Homebuilding LLC master plan two-story triplex, R-5 occupancy, one- & two-facility dwelling. Plan1 livable at 1725 and nonlivable at 564, Plan2 livable at 1770 and nonlivable at 574, Plan3 livable at 2055 and nonlivable at 554. Water service 1 inch with 3/4 or 1-inch meter. 200 amp panel electric service. Deferred truss calcs. Fire sprinklers required: submit as an addenda. Special inspection for post tension, epoxy anchors, and soils grading and drainage. EV charger. R
SHEA HOMES #4026 - New 3133 SF two story residence with a 2+ car tandem garage in AVALON CROSSING. New gas, water and electric meters. Special inspection for pot tensions slabs
Tenant improvement of a 4,600 SF existing, construction type III-B office space to an indoor dog daycare, boarding, and grooming space. Scope includes construction of new secure yard areas for exercise, installation of durable and sanitary finishes, and minor MEP's. Deferred fire sprinklers. Reviewed as noted. Results in CoO.
Interior modification to existing baler/process area. Construct new 8-inch CMU wall and associated concrete curb to provide a 1-hour fire-resistance-rated separation between the existing F-1 Baler Room and H-3 Extruder/Open Process Area. Work includes demolition of existing door/wall components, modifications to existing openings, relocation of affected equipment/controls, and associated structural work. Existing building is Type II-B construction and fully sprinklered. Special inspections requi
New one-story parish office building that replaces the current facility to serve the existing campus. New building program includes: public lobby vestibule, conference rooms, breakroom, private office spaces for administration offices as well as private offices for adult-religious education offices, a teen life classroom. All existing fire lanes remain and existing entry / exit driveways remain. Minor landscape and site development includes: new concrete sidewalks and points of connection to ent
Convert existing 972 Sq Ft garage to livable space for existing SFR including new Electrical, Mechanical and Plumbing. No deferred submittals. Minimum required building inspections: Footing, stem, frame, mechanical rough in, electric rough in, plumbing rough in, insulation and final.
Tenant improvement of an existing 2-story, 56,018 SF, type VB construction, S1 occupancy with 3,428 SF group B accessory occupancy automotive parts building and 1,460 SF, group S1 occupancy car wash addition. Modifications include demo of interior partitions, plumbing fixtures, exterior windows and storefronts system, removal of overhead doors, removal of existing roof system included mech equip, drive service canopy. Interior modifications to include new business center area with breakroom, re
PLUMBING PERMIT FROM TUB TO NEW SHOWER CONVERSION. NO DRAIN RELOCATION. 96-IN SMOOTH WALL SURROUND, NEW SHOWER TRIM, THREE CORNER SHELVES, 24-IN GRAB BAR & .25-IN PRIVACY GLASS ENCLOSURE. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
INSTALLATION OF 135-FT OF 2-IN PE GAS LINE BURIED 18-IN WITH 18-GAUGE TRACER WIRE FROM GAS METER TO 100K BTU FIREPIT, 30-FT OF 2-IN PE GAS LINE FROM TEE TO 75K BTU BBQ AND 5-FT OF 2-IN PE GAS LINE FROM TEE TO 60K BTU SIDE-BURNER. ALL GAS LINES ARE TO BE INSTALLED PER 2024 IFGC AND SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED.
Group A-3 and U occupancies. Type V-B construction. 4,501 SF. Occupant load 237. New semi-public pool, spa, restroom/equipment building in rental community REF: PMT20-09359. New structural, architectural, and MEP. Utilities provided under PMT20-09359.Special inspections required: masonry construction. Results in CofO.
Demo of existing tenant space and previous tenant feature, in an existing V-B construction building. Return suite to gray shell condition. No modifications to fire sprinkler system. Reviewed as noted. Results in CoC.
Upgrade existing 200-amp electrical service to new 400-amp service for the existing residence and detached ADU. Install new 400-amp meter-main with dual 200-amp distribution sections, new feeders, grounding and bonding, and reconnect existing branch circuits. No other utility changes. No deferred items. No special inspections. Minimum required building inspections: Electric rough in and electric final.
Adding gas line and pool heater
RETAIL INTERIOR TENANT IMPROVEMENT BUILDOUT FOR A PROPOSED VERIZON STORE IN SUITE #3 OF EXISTING SHELL BUILDING. SCOPE TO INCLUDE INTERIOR WALLS, RESTROOM, MEP, AND PAINT. FIXTURE INSTALLATION BY TENANT. SHELL PMT26-11315
Remodel of existing residence into a 2 bedroom, den, 3 bath with new patio addition along with detached ADU/garage.
Plumbing permit to replace existing wet space with new shower including new 54x30 low-profile center-drain shower pan and prefabricated acrylic walls in the guest bathroom. No structural changes. New installations will tie into existing piping. No change to overall square footage. No other work under this permit. All work to comply with 2024 IRC and 2023 NEC.
Attached 574 Sq Ft ADU with 22 Sq Ft covered patio
Installation of 22kw generator, sub panel, transfer switch, and dedicated gas line to existing SFR. Minimum required building inspections: Electric rough in and electric final, Gas rough in and gas pipe final, and final.
CIVIL AND STRUCTURAL IMPROVEMENTS TO REPLACE THE EXISTING SITE PERIMETER FENCING ALONG A PORTION OF THE SOUTHERN BOUNDARY AND ALL OF THE WESTERN BOUNDARY OF THE SITE WITH A NEW CMU MASONRY BLOCK SCREEN WALL. IMPROVEMENTS ALSO INCLUDE EXTENDING THE HEIGHT OF A PORTION OF THE EXISTING NORTHERN CMU SCREEN WALL.
Renovate all existing HVAC equipment. Several units have failed and are in need of replacement immediately.
Replace existing 200A Federal Pacific electrical service equipment with new Siemens 200A all-in-one meter/main in revised location. Install new 2-1/2-inch service riser and excavate splice pit for SRP utility connection. Reconnect existing branch circuits. No increase in service capacity.
Installation of electrical power distribution, branch circuits, and equipment connections for CNC machining equipment, coolant supply systems, FANUC robotic equipment, automated vertical storage units, and associated manufacturing equipment. Reviewed as noted. Results in CoC.