Search Permits
166,472 results
Sanitary sewer ejection pump re-location.
Unit 101 Bldg 1: New 3-story townhome with 3 bedroom 3.5 bathroom balcony attached 2-car carport. Part of 3-unit townhome building in 3-unit use. (9 units on 3 properties sharing 1-driveway utilizing a flag-lot configuration)
Unit 102 Bldg 1: New 3-story townhome with 3 bedroom 3.5 bathroom balcony attached 2-car carport. Part of 3-unit townhome building in 3-unit use. (9 units on 3 properties sharing 1-driveway utilizing a flag-lot configuration)
New construction two-story SFR with 4 bed 3.5 bath
Bldg 101: New 3-story townhome unit with 3 bedroom 3.5 bathroom covered patio attached carport. Part of 3-unit townhome under 3-unit use.
Installation of 42.275 kW roof mounted solar system + 2 PW3s + 1 PW3 Expansion Pack
ePlan: Residential Expedited Review - New construction of a 1-Story Single Family Res. [5bed 4bath] with Attached Garage.
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A582 New 2 story attached unit with 2 bedrooms 2.5 bathrooms and a 2 car garage.
New construction of 2 story sfr with 4 beds 3 baths 2 car garage and covered patio
200amp OH service build
Express: window replacement (like for like); repair and replace drywall; interior electrical wiring for light fixtures outlets and switches REVISION 1: Add MP for new range hood/kitchen exhaust vent PP for new shower pan
ePlan: Commercial Expedited Review - Change of Use for Existing Retail space to Allow for Alcohol/Food Sales. (2960 SF)
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work HVAC changeout/alteration: Remove and replace the existing 3-ton vertical gas split system (air handler/furnace and outdoor condenser) on a like-for-like basis; no structural change.
We will be installing a sprinkler system
Replacement of complete existing central heat and air system with or without duct work 2.5ton Gas Comfort Replacement
Provide electrical for service upgrade and bring up to code per nec requirements.
Temporary power panel ref: 2025 091605 BP
install/replace 200 amp main breaker panel and meter can (underground)
Construct new driveway approach of 17 FT and sidewalk of 21.2 LF
Unit 103 Bldg 1: New 3-story townhome with 3 bedroom 3.5 bathroom balcony attached 2-car carport. Part of 3-unit townhome building in 3-unit use. (9 units on 3 properties sharing 1-driveway utilizing a flag-lot configuration)
temporary tpole for new construction for cascades at oc ref BP: 2026-029556
Replacement of an existing water heater swapping the gas tank water heater for a similar model
Disconnect/reconnect to replace utility meter.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Install a 24 kW Generac with ATS; conduit will run on the exterior of the house to the generator in back yard. AE Load-side work only. schedule shutdown required; no new meter can or main panel.
Replacement of complete existing central heat and air system with or without duct work 3.5T Gas Replacement
Homebuilder Loop Austin 2 Mile ETJ Austin Energy
Construct new driveway approach of 17 FT and sidewalk of 21.2 LF
Garner S401 C Left New - 1 Story SFR w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.