Install (1) temporary vinyl banner while awaiting permanent signage
1146 N ALMA SCHOOL RD 116, Mesa, AZ
Permit Details
- Permit Number
- PMT26-14603
- Type
- svc
- Status
- finaled
- Issued Date
- October 16, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Julie Kulka
About svc Permits in AZ
0
svc permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
Demo portion of exterior wall and storefront door at an existing warehouse building. Install (2) fast track doors, store front door, and vehicle wash portal. Install electrical meter 3000A 3 phase. New structural, plumbing, and electrical. Special inspection required: electrical, post-installed anchors and concrete. Results in CofC.
7035 E PECOS RD 1091 · PMT26-15915
Encroachment Permit for outdoor dining area. Related to PMT26-14204 for TI and occupancy. Results in CoC.
104 W MAIN ST 101 · PMT26-16046
Replacing a damaged 200a main service and upgrading to a new 400a main panel.
3838 E JUNIPER ST · PMT26-17406
room addition
111 S GREENFIELD RD 614 · PMT26-18873
Similar svc Permits
Install (1) non illuminated building sign flat cut letters on die bond backer: MATRIX CAR CARE 24 sf
Mesa, AZ · PMT26-11569
Request for a minor location adjustment to the West Side Monument sign on Eastmark Parkway. The GC is installing (2) flagpoles near this sign, which requires shifting the monument slightly from its originally approved location. The sign’s new location is approximately 22 feet from the property line and 2’-6” east of the previously approved position. The sign angle and overall dimensions remain unchanged. Updated sign location plan drawings are included to show that the monument continues to comp
Mesa, AZ · PMT26-04797
Installation of one set of front-lit pan channel lettersets and logo box, flush-mounted to the building 46 sq. ft. Signs shall be installed per NEC 2023 with UL listed components.
Mesa, AZ · PMT26-12722
Install (2) LED illuminated channel logos and letter display, north elevation w/logo ASHLEY 100.85 sf, south elevation w/logo ASHLEY 154.58 sf. Replacement of tenant faces.
Mesa, AZ · PMT26-12886
Install one (1) illuminated building mounted wall sign on the west elevation of the building
Mesa, AZ · PMT26-17301
About svc Permits in Mesa, AZ
What is a svc permit?
A svc permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.