PermitDig
svcFinaled

Request for a minor location adjustment to the West Side Monument sign on Eastmark Parkway. The GC is installing (2) flagpoles near this sign, which requires shifting the monument slightly from its originally approved location. The sign’s new location is approximately 22 feet from the property line and 2’-6” east of the previously approved position. The sign angle and overall dimensions remain unchanged. Updated sign location plan drawings are included to show that the monument continues to comp

3856 S EVERTON TERR, Mesa, AZ

Permit Details

Permit Number
PMT26-04797
Type
svc
Status
finaled
Issued Date
October 16, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
Iqra Alvi

About svc Permits in AZ

0

svc permits in AZ

About svc Permits in Mesa, AZ

What is a svc permit?

A svc permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.