PermitDig
svcIssued

Installation of one LED Face Lit Channel Letters On Backer Panel on East Elevation of Suite BOSA DONUTS COFFEE & SMOOTHIES 43 sq. ft. and one LED Face Lit Channel Letters Flush Mounted To Wall on South Elevation BOSA DONUTS 10 sq. ft. Signs shall be installed per NEC 2023 with UL listed components.

4517 S POWER RD 105, Mesa, AZ

Permit Details

Permit Number
PMT26-13368
Type
svc
Status
issued
Issued Date
October 6, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
Jacob Nguyen

About svc Permits in AZ

0

svc permits in AZ

Other Permits in Mesa, AZ

New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi

3101 E ELMWOOD ST · PMT25-23465

Civil improvement plans only. REF: PMT26-08579 for bldg. Water Meters: (1) 1-inch landscape.

5118 S 71ST ST · PMT26-10001

CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 24-FT X 26-FT 2026 ABOVE GROUND SET CLAYTON MH SERIAL NO. BUC017864AZAB WITH A/C AT REAR.GAS. ONE 13-FT X 40-FT ATTACHED AWNING PER ICCESR 1398. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MIN TWO 9-FT X 18-FT W/ ONE SPACE MUST BE COVERED, PAVED WITH 2-IN OF ASPHALT OR 4-IN OF CONCRETE, UNOBSTRUCTED PARKING SPACES BEHIND FRONT SETBACK. 44-FT X 81-FT PERIMETER LOT. MIN SETBACKS: 1-FT FRONT, 4-FT REAR, 3-FT MH SIDE, 1-FT AWNING SIDE, MI

345 S 58TH ST 32 · PMT26-11388

Interior mechanical gallery partition walls within approximately 53,218 SF of the second floor of an existing construction type II-B building. Scope limited to architectural wall construction only. No mechanical, electrical, or equipment installations under this permit. Existing shell building under PMT24-06075. Reviewed as noted. Results in CoC.

8807 E WARNER RD · PMT26-12295

Install (2) exterior wall mounted illuminated signs with pan channel lettering: FIFTH THIRD BANK w/logo 24.5 sq ft each.

1825 S VAL VISTA DR · PMT26-09415

About svc Permits in Mesa, AZ

What is a svc permit?

A svc permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.

PermitDig — Building Permit Search & Data