Installation of roof mounted Solar Panels with inverter.1 circuit 125amps
1220 Park Island Dr, New Orleans, LA
Permit Details
- Permit Number
- new_orleans_la2-45674
- Type
- solarapp+
- Status
- issued
- Issued Date
- June 22, 2026
- County
- New Orleans, LA
Parties
No contractor listed
About solarapp+ Permits in LA
0
solarapp+ permits in LA
Other Permits in New Orleans, LA
Pressure test and repair leak
4627 Tchoupitoulas St · new_orleans_la2-24753
vacancy inspection
2309 Clouet St · new_orleans_la2-26072
Vacancy permit. Power has been off for more than 6 months. NO ELECTRICAL WORK UNDER THIS PERMIT. THIS PERMIT IS FOR THE PURPOSES OF AN ELECTRICAL VANCANCY FOR 4328 BAUDIN ST.
4328 Baudin St · new_orleans_la2-31300
Upgrade meter pan and two disconnects 200 amps
5 Swan St · new_orleans_la2-38719
Replace damaged underground conduit from Entergy pull box to meter. Emergency reconnect needed 200amps
554 Amethyst St · new_orleans_la2-7311
Similar solarapp+ Permits
Installation of 31 roofmounted solar panels & 1 Tesla Powerwall backup battery.
New Orleans, LA · new_orleans_la2-14441
Solar Panel Installation
New Orleans, LA · new_orleans_la2-3150
Solar System Installation
New Orleans, LA · new_orleans_la2-84593
Installation of a residential rooftop solar photovoltaic (PV) system at an existing single-family home located at 4936 Dreux Ave, New Orleans, LA 70126. Scope of work includes mounting and installation of eighteen (18) Aptos Solar modules (545W each) with nine (9) APsystems DS3 microinverters, roof-mounted racking system, electrical wiring, junction boxes, AC disconnect, backfed breaker interconnection to the existing electrical service panel, required labeling, grounding, and utility interconne
New Orleans, LA · new_orleans_la2-10460
Solar Permitting for Greenlancer Client. Install Array grounding. Wire manage romex in attic. Install ground rods as needed.
New Orleans, LA · new_orleans_la2-44709
About solarapp+ Permits in New Orleans, LA
What is a solarapp+ permit?
A solarapp+ permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In New Orleans, LA, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from New Orleans, LA's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.