PermitDig
single_family_(detached)C of o issued

Single family detached Dream Finders Homes Plan 2 master plan application Master plan for new 1801 S.F livable, 587 S.F. non-livable. 2 story - single-family home construction. Type V-B construction. R-5 occupancy. New ¾” water and 200 amp electric meter. New gas meter. Special inspections required for post-installed anchors in PT slab, reinforcing steel-prestressing tendons. Truss Calcs and fire sprinklers deferred. EV-Charger in garage.

1823 E KRAMER ST, Mesa, AZ

Permit Details

Permit Number
PMT26-07883
Type
single_family_(detached)
Status
c of o issued
Issued Date
October 20, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
Hannah Jenkins

About single_family_(detached) Permits in AZ

0

single_family_(detached) permits in AZ

Other Permits in Mesa, AZ

New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi

3101 E ELMWOOD ST · PMT25-23465

CONSTRUCT A 312-SF SWIMMING POOL. NO SPA. NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MONEY #30895, EXPIRES 12/31/26. REF MST26-01206. ENGINEERING AND STRUCTURAL CALCULATIONS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS

8052 E PETERSON AVE · PMT26-11949

Casita has been built already and I am looking to get it permitted. Re COD26-03737. Minimum required building inspections: Footing, stem, strap/shear, frame, insulation, drywall shear and final. If needed, underground electrical and plumbing.

556 S CRESTON · PMT26-11912

New 875 SF Type V-B canopy and remodel of the existing concession stand. Scope of work includes demolition and replacement of the existing canopy, interior and exterior renovations to the concession kitchen and service area, associated mechanical, electrical, and plumbing (MEP) work, and finishes. Deferred truss calculations. Special inspections required for soils, concrete, and structural steel. Results in CoC.

2145 S FARNSWORTH DR · PMT26-10460

Tenant improvement at existing Banner Urgent care to convert an existing room into an Xray room. Modifications include removal of exterior door, interior walls, and saw cutting of concrete for utility, reconfigure existing room size, furred interior walls at window locations, new sink, lighting and associated MEP. Special inspection req. - post installed anchors. Deferred fire sprinklers. Approved with comments. Results in CoC.

1121 S GILBERT RD 102 · PMT26-03601

Similar single_family_(detached) Permits

New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi

Mesa, AZ · PMT25-23465

TAYLOR MORRISON #4021 - HAWES CROSSING - NEW 1938 SF SINGLE STORY RESIDENCE WITH 2 CAR GARAGE AND TANDEM GARAGE OPTIONS. NEW WATER, GAS AND ELECTRIC METERS. REQUIRES POST TENSION SLAB SPECIAL INSPECTIONS. ADDENDA MST25-01218 - SHEET S1.01 · ADDED PARCEL H INFORMATION · REVISED GEOTECHNICAL REPORT DATES · ADDED PARCELS BLOCK · ADDED 9" TO SHEET TITLE SHEET S1.02 · ADDED 9" TO SHEET TITLE · ADDED PARCELS BLOCK SHEET S1.03 · ADDED PARCEL H INFORMATION · REVISED GEOTECHNICAL REPORT DATES · ADDED P

Mesa, AZ · PMT26-09709

New 2309 SF single story residence with a 2+ car garage at Hawes Crossing. Includes water, electric and gas meter. Special inspections for post tension slabs **SEE ADDENDA MST25-07605**

Mesa, AZ · PMT26-08205

New 550 sf livable bedroom and office addition at existing SFR. Special inspections required for drill & epoxy. Minimum required building inspections: Footing, stem, strap/shear, frame, insulation, drywall shear and final. If needed, underground electrical and plumbing.

Mesa, AZ · PMT26-13309

Construct new 3,805 SF livable single-story custom home with 1,233 SF non-livable. Type V-B construction. Existing structure demolition under PMT26-09724. New driveway cut, Existing 1" water meter to remain. New 400 amp electrical service and gas meter. Deferred roof truss calculations. Special inspections required for concrete construction including post-tensioned slab-on-ground foundation, soils and post-installed anchors. Minimum required building inspections: Plumbing underground, footing, s

Mesa, AZ · PMT26-15621

About single_family_(detached) Permits in Mesa, AZ

What is a single_family_(detached) permit?

A single_family_(detached) permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.