Remove existing tank gas water heater and install new 199k btu tankless gas water heater in existing SFR. VB construction. Minimum required building inspections: Gas rough, gas final and final.
5504 E GLADE AVE, Mesa, AZ
Permit Details
- Permit Number
- PMT26-17413
- Type
- Plumbing
- Status
- issued
- Issued Date
- November 13, 2026
- County
- Mesa, AZ
Parties
- Contractor
- rebecca Dornbsuch
About Plumbing Permits in AZ
0
Plumbing permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
Install (1) 37.60 sf illuminated Multi-tenant Monument Sign. Results in CofC.
5416 E BASELINE RD FH1 · PMT26-17311
Add a second receptable for an additional washer/dryer unit
9754 E NAVARRO AVE · PMT26-17807
Add patio to backyard of house.
811 S BRISTOL · PMT26-19368
SRP is requiring a repair to reconnect the service lines to the mast head. Power is off. This is an emergency request to restore power for the occupants. The main support for the riser pipe from the top of the service panel, up to the masthead above the roof, is not connect per code. The wood for the support right above the service panel is split and not secure. We will have to repair the split wood and re-support wit new framing.
113 N JADE CIR · PMT26-20635
Similar Plumbing Permits
Replace existing tank gas water heater, to install a new tankless gas water heater. Minimum required building inspections: Gas underground, gas rough in and gas pipe final.
Mesa, AZ · PMT26-17419
PLUMBING PERMIT TO REPLACE EXISTING WET SPACE WITH NEW SHOWER IN MASTER BATHROOM. NEW VALVE AND PREFABRICATED ACRYLIC WALLS. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
Mesa, AZ · PMT26-17552
PLUMBING PERMIT TO REPLACE EXISITING WET SPACE WITH NEW SHOWER TO SHOWER IN MASTER BATHROOM AND TUB TO SHOWER IN HALL BATHROOM, INCLUDING NEW VALVE AND PREFABRICATED ACRYLIC WALLS. GLAZING IN SHOWER DOORS SHALL BE SAFETY GLAZING – TEMPERED. R324.4.1. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
Mesa, AZ · PMT26-19504
Converting tub to shower. Replacing pan, drain, and valves. Using a glass door.
Mesa, AZ · PMT26-20610
Converting shower to shower. Replacing pan, drain, and valves. Using a glass door.
Mesa, AZ · PMT26-20614
About Plumbing Permits in Mesa, AZ
What is a Plumbing permit?
A Plumbing permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.