Addition of 1/2" gas line to new fireplace teeing off from existing gas pipe. Minimum required building inspections: Gas rough in and gas pipe final.
5029 S CAMBIUM LN, Mesa, AZ
Permit Details
- Permit Number
- PMT26-15011
- Type
- Plumbing
- Status
- issued
- Issued Date
- October 26, 2026
- County
- Mesa, AZ
Parties
- Contractor
- James Martinez
About Plumbing Permits in AZ
0
Plumbing permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
CONSTRUCT A 520 SF SWIMMING POOL NO SPA/NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MONEY #30895, EXPIRES 12/31/26. REF MST26-01206 ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS".
1606 E MINTON ST · PMT26-10949
Existing 1 car carport to be converted to livable ADU space a existing SFR. No change to overall square footage. Minimum required building inspections: Footing, stem, frame, insulation and final. If needed, underground plumbing.
2240 E BALSAM CIR · PMT26-11964
COD26-02914 Converting carport to garage
2023 W OBISPO AVE · PMT20-19625
New development of single story, 4,788 Sf, type VB construction, A3 and B occupancy clubhouse building with 1,006 SF entry canopies. Development to include Onsite improvements, Offsite improvements, Landscape, site amenities such as Pickleball court, (2) Dog parks, playground area, a 256 Sf type IIB, U occupancy mail box covered area. Pool and Spa to be separate permit. Special inspection required for steel, concrete, soils. Deferred roof truss. Deferred fire sprinklers and fire alarm. Water met
1440 S CRISMON RD · PMT26-09442
Similar Plumbing Permits
Plumbing
Hyde Park, MA · PL1843431
Plumbing permit to repair existing gas line like for like at existing SFR, to be installed per City of Mesa and Southwest Gas codes and requirements. Gas pressure test required. No plans Required. *****This permit is for emergency gas line repair like for like only, and does not allow any new gas line installations.*****
Mesa, AZ · PMT26-19210
Work Will include saw cutting concrete toward the fence (about 14 ft diagonally) to reach dirt, dig down roughly 20-24 inches, and place a gas (2") line in trench. trench will be roughly 125-150ft total.
Mesa, AZ · PMT26-19471
Install approximately 140 linear feet of new 2" underground polyethylene (PE) gas piping from the existing gas meter to the pool heater location. Scope includes trenching, tracer wire, two gas risers, and pressure testing. Final connection to pool heater is excluded and will be performed separately.
Mesa, AZ · PMT26-19466
Install approximately 140 linear feet of new 2" underground polyethylene (PE) gas piping from the existing gas meter to the pool heater location. Scope includes trenching, tracer wire, two gas risers, and pressure testing. Final connection to pool heater is excluded and will be performed separately.
Mesa, AZ · PMT26-19465
About Plumbing Permits in Mesa, AZ
What is a Plumbing permit?
A Plumbing permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.