PermitDig
PlumbingIssued

INSTALLATION OF 143-FT OF 2-IN PE GAS LINE BURIED 18-IN WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER, 15-FT OF 3/4-IN PE GAS LINE TO GAS STUB. ALL GAS LINES TO BE INSTALLED PER 2018 IFGC & SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED. EFFECTIVE JANUARY 8, 2026, THE CITY OF MESA ADOPTED 2024 ICC AND 2023 NEC. AN APPROVED CODE MODIFICATION WAS ADDED TO THIS PERMIT ALLOWING CONTINUED COMPLIANCE WITH 2018 ICC AND 2017 NEC. STARTING APRIL 8, 2026, AL

9634 E SECTOR DR, Mesa, AZ

Permit Details

Permit Number
PMT26-04508
Type
Plumbing
Status
issued
Issued Date
March 24, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
KAYLA A CARTWRIGHT

About Plumbing Permits in AZ

0

Plumbing permits in AZ

About Plumbing Permits in Mesa, AZ

What is a Plumbing permit?

A Plumbing permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.