***PLUMBING PERMIT ONLY*** INSTALL NEW 3/4" WATER METER (1" SERVICE LINE) ON LOT # 25. HOLDING TANK UNDER PMT22-1432 TO BE REMOVED AT TIME OF WASTE WATER INSTALLATION. TRANSFER FEES FROM PMT22-01432A ($120.00). REVISION TO PERMIT PMT22-01432 TO INCLUDE WATER METER, SEWER AND WATER IMPACT FEES. ***PARENT PERMIT INCLUDES*** "ADMINISTRATIVE USE PERMIT PER SEC 11-70-3 OF THE ZONING ORDINANCE FOR A TEMPORARY SALES OFFICE WITH RESTROOMS WITHIN RESIDENTIAL ZONING DISTRICT FOR HOMES BEING CONSTRUCTED IN
6103 S ANTONIO, Mesa, AZ
Permit Details
- Permit Number
- PMT22-08309
- Type
- Plumbing
- Status
- c of c issued
- Issued Date
- March 3, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Toll Brothers
About Plumbing Permits in AZ
0
Plumbing permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
New 454 sq ft covered patio with concrete floor and footings for new covered roof. Building and Zoning inspection.
11114 E DIAMOND AVE · PMT26-15717
Construct a 2 bedroom Casita in the backyard of my current residence. Reviewed as Noted: 1 row of citrus trees required at rear and side yards.
3352 E JUNE CIR · PMT26-17537
Fully equipped Nail Salon with new drywalls, HVAC, Plumbing & electrical works, etc. Deferred fire sprinklers.
2740 S ALMA SCHOOL RD 4 · PMT26-18356
Fire alarm TI. Adding NAC and monitor devices to existing system
1235 S SIGNAL BUTTE RD 101 · PMT26-19750
Similar Plumbing Permits
About Plumbing Permits in Mesa, AZ
What is a Plumbing permit?
A Plumbing permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.