PermitDig
non-structuralIssued

Remove approximately 120 square feet of existing sidewalk within the City of Mesa right-of-way and construct a new 10 ft wide concrete driveway approach providing vehicular access from the street to the existing gravel driveway and gate. Work includes sawcutting, demolition, excavation, grading, subgrade compaction, forming, concrete placement, control joints, broom finish, and smooth transitions to the existing sidewalk and roadway. The pedestrian route across the driveway approach will be main

1548 N ROWEN, Mesa, AZ

Permit Details

Permit Number
PMT26-16952
Type
non-structural
Status
issued
Issued Date
November 3, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
Tim Merchel

About non-structural Permits in AZ

0

non-structural permits in AZ

About non-structural Permits in Mesa, AZ

What is a non-structural permit?

A non-structural permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.