PermitDig
new_park_modelIssued

INSTALLATION OF 12.1-FT X 34.1-FT 2027 CAVCO TUSCANY PARK MODEL WITH AC IN REAR. VIN NO. CFPUS3342V1211777. NO GAS OR LP TANKS. NO AWNING. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MINIMUM ONE 9-FT X 18-FT UNOBSTRUCTED PAVED PARKING REQUIRED BEHIND FRONT SETBACK ON 2-IN ASPHALT OR 4-IN CONCRETE. 35-FT X 58-FT INTERIOR LOT. MINIMUM SETBACKS ARE 5-FT MIN MEASURED FROM EDGE OF ASPHALT, 3-FT REAR FOR INTERIOR LOTS, 18-IN SIDES FOR LOTS LESS THAN 35-FT WIDE. APPROVED AS NOTED.

4860 E MAIN ST T175, Mesa, AZ

Permit Details

Permit Number
PMT26-19052
Type
new_park_model
Status
issued
Issued Date
November 6, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
CAL-AM CONSTRUCTION SERVICES

About new_park_model Permits in AZ

0

new_park_model permits in AZ

About new_park_model Permits in Mesa, AZ

What is a new_park_model permit?

A new_park_model permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.