International Residential Code
Block 6.07 Lot 135, Avalon, NJ
Permit Details
- Permit Number
- 260199+A
- Type
- new
- Status
- permit
- Issued Date
- June 24, 2026
- County
- New Jersey (statewide), NJ
Parties
No contractor listed
About new Permits in NJ
0
new permits in NJ
Other Permits in Avalon, NJ
International Residential Code
Block 40.04 Lot 55.01 · 260318
Multiple family dwellings, dormitories, etc.
Block 21.03 Lot 39 · 260319
Accessory buildings and miscellaneous structures
Block 15.02 Lot 8 · 260317
International Residential Code
Block 41.04 Lot 43.01 · 260315
International Residential Code
Block 22.04 Lot 72 · 260316
Similar new Permits
Construct east two-family dwelling (Establish use as single-family residence & allow attached accessory dwelling unit (AADU) per land use code. Construct (2) two-family dwellings per plan. Review & process for (2) records under 7115881-CN)
SEATTLE, WA · 7115881-CN
Construct west two-family dwelling (Establish use as single-family residence & allow attached accessory dwelling unit (AADU) per land use code. Construct (2) two-family dwellings per plan. Review & process for (2) records under 7115881-CN))
SEATTLE, WA · 7123239-CN
Establish use as floating home per land use code. Construct one-family dwelling per plan
SEATTLE, WA · 6988568-CN
Construct WEST two-family dwelling per plan. [Establish use as townhouse per land use code.. Construct two-family dwellings per plan. Review and processing for (2) construction records under 7099413-CN.]
SEATTLE, WA · 7099413-CN
Allow housing for (1) detached dwelling unit per land use code. Existing detached dwelling unit to remain. Construct one-family dwelling per plan.
SEATTLE, WA · 7132429-CN
About new Permits in Avalon, NJ
What is a new permit?
A new permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In New Jersey (statewide), NJ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from New Jersey (statewide), NJ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.