-Install 4 Ton DAIKIN FIT variable speed system (1st floor front) - Install 2.5 Ton DAIKIN FIT variable speed system (1st floor rear) - Install 1.5 ton Daikin FIT variable speed system (2nd floor primary suite) - Install 5 ton Daikin FIT variable speed system (2nd floor) - Fabricate plenums and install duct R-8 flexible duct -Run refrigerant lines - Run all necessary low voltage control wiring - Run primary drain lines to plumber provided P-traps - Provide emergency overflow drain pan - Run emer
2425 Coliseum St, New Orleans, LA
Permit Details
- Permit Number
- new_orleans_la2-42097
- Type
- mechanical_hvac
- Status
- issued
- Issued Date
- April 24, 2026
- County
- New Orleans, LA
Parties
No contractor listed
About mechanical_hvac Permits in LA
177
mechanical_hvac permits in LA
$89,556
Average estimated value
Other Permits in New Orleans, LA
renovation_(structural_or_non-structural)
2201 Magnolia St · 26-28762-RENO
electrical_service_/_circuit_/_feeder
2234 Marais St · 26-29899-SERV
electrical_service_/_circuit_/_feeder
2236 Marais St · 26-29900-SERV
construction_loop
2037 Ursulines Ave · 26-31196-LOOP
electrical_service_/_circuit_/_feeder
2037 Ursulines Ave · 26-31197-SERV
Similar mechanical_hvac Permits
About mechanical_hvac Permits in New Orleans, LA
What is a mechanical_hvac permit?
A mechanical_hvac permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In New Orleans, LA, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from New Orleans, LA's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.