Please do not request inspections under this permit until 2 business days after permit issuance.1.Run new dedicated wire from panel to new gas stove 2. Install 14-50 receptacle behind stove. 3. Install 40amp 240v 2pole qo breaker. 4. Install 20amp 120v new dedicated outlet in basement
3610 SPRUELL DR, Silver Spring, MD 20902
Permit Details
- Permit Number
- 1173693
- Type
- install
- Status
- issued
- Issued Date
- October 6, 2026
- County
- Montgomery County, MD
Parties
No contractor listed
About install Permits in MD
0
install permits in MD
Other Permits in Silver Spring, MD
Please do not request inspections under this permit until 2 business days after permit issuance.rough-in new receptacle outlets and light fixtures
1504 STATESIDE DR · 1175197
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL CONNECTDER METER ADAPTER WITH INTEGRATED 60A PV BREAKER.
3407 FLORAL ST · 1175255
Please do not request inspections under this permit until 2 business days after permit issuance.PV SOLAR PANEL INSTALLATION ROOF MOUNTED 39 MODULES-ROOF MOUNTED - 15.990 kW DC, 13.611 kW AC INSTALL NEW SERVICE RATED TAP BOX
12312 TAMPICO WAY · 1175248
Please do not request inspections under this permit until 2 business days after permit issuance.Installation ass-on of one outdoor camera.
1123 HEARTFIELDS DR · 1175241
Please do not request inspections under this permit until 2 business days after permit issuance.PANEL UPGRADE TO HEAVY UP FROM 150 AMP TO 200 AMP
906 PLAYFORD LN · 1175222
Similar install Permits
Please do not request inspections under this permit until 2 business days after permit issuance.rough-in new receptacle outlets and light fixtures
Silver Spring, MD · 1175197
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL CONNECTDER METER ADAPTER WITH INTEGRATED 60A PV BREAKER.
Silver Spring, MD · 1175255
Please do not request inspections under this permit until 2 business days after permit issuance.Install 24kw Generator with 1 200 amp service rated transfer switch
Ashton, MD · 1172634
Please do not request inspections under this permit until 2 business days after permit issuance.LOW VOLTAGE WIRING FOR TH
Chevy Chase, MD · 1175250
Please do not request inspections under this permit until 2 business days after permit issuance.PV SOLAR PANEL INSTALLATION ROOF MOUNTED 39 MODULES-ROOF MOUNTED - 15.990 kW DC, 13.611 kW AC INSTALL NEW SERVICE RATED TAP BOX
Silver Spring, MD · 1175248
About install Permits in Silver Spring, MD
What is a install permit?
A install permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Montgomery County, MD, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Montgomery County, MD's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.