Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel, wired touchpad, and three hardwired outdoor cameras.
17025 OAK HILL RD, Spencerville, MD 20868
Permit Details
- Permit Number
- 1145401
- Type
- install
- Status
- issued
- Issued Date
- January 6, 2026
- County
- Montgomery County, MD
Parties
No contractor listed
About install Permits in MD
0
install permits in MD
Other Permits in Spencerville, MD
Please do not request inspections under this permit until 2 business days after permit issuance.Recessed lights, 5 circuits for kitchen appliances.
16103 DRAYTON FARM DR · 1174036
Please do not request inspections under this permit until 2 business days after permit issuance.Remove and replace defective inverter. No other changes or upgrades to occur from original installation.
16122 DRAYTON FARM DR · 1173703
Please do not request inspections under this permit until 2 business days after permit issuance.PANEL UPGRADE FROM 100 TO 200 AMPS.
1312 PARRS RIDGE DR · 1172460
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 29 roof mounted solar panels.
1127 PARRS RIDGE DR · 1144287
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 13.92kw (32) roof-mounted solar modules on existing SFD
16116 DRAYTON FARM DR · 1140402
Similar install Permits
Please do not request inspections under this permit until 2 business days after permit issuance.rough-in new receptacle outlets and light fixtures
Silver Spring, MD · 1175197
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL CONNECTDER METER ADAPTER WITH INTEGRATED 60A PV BREAKER.
Silver Spring, MD · 1175255
Please do not request inspections under this permit until 2 business days after permit issuance.Install 24kw Generator with 1 200 amp service rated transfer switch
Ashton, MD · 1172634
Please do not request inspections under this permit until 2 business days after permit issuance.LOW VOLTAGE WIRING FOR TH
Chevy Chase, MD · 1175250
Please do not request inspections under this permit until 2 business days after permit issuance.PV SOLAR PANEL INSTALLATION ROOF MOUNTED 39 MODULES-ROOF MOUNTED - 15.990 kW DC, 13.611 kW AC INSTALL NEW SERVICE RATED TAP BOX
Silver Spring, MD · 1175248
About install Permits in Spencerville, MD
What is a install permit?
A install permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Montgomery County, MD, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Montgomery County, MD's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.