PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
7359 E FLOWER AVE, Mesa, AZ
Permit Details
- Permit Number
- PMT26-15489
- Type
- Electrical
- Status
- issued
- Issued Date
- November 12, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Fria Valencia
About Electrical Permits in AZ
0
Electrical permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
Need a permit for curb cut in right side of front yard facing west or facing Barkley. Need a 9 ft curb cut.
1317 N BARKLEY · PMT26-07896
Onsite grading, drainage, paving, utilities, landscaping, street lights, structural, and site electrical. Scope includes base of new monument sign for water feature and shade structure. Special inspection for steel, concrete, masonry, and soils. New (1) 2-inch landscape meter, (1) 3/4-inch water feature meter, (2) electric meters, and (1) gas meter. Deferred electric vehicle gate. Citrus trees to be installed within 6 months of CofO issuance. Results in CoC.
Unknown · PMT26-10520
LANDSEA HOMES #35-1400 1966 S.F. single-family construction. New water and electric meters. Special inspections required for post-installed anchors in PT slab. Truss Calcs deferred. Addenda MST24-21764 Replace insulation with blown in cellulose, updated vent calculations, revise roof plans, remove additional attic scuttle/access from garage, insulation at open attic, some minor electrical, updated energy report and certificate to use 3V.1, revised mechanical sheets. Addenda To MST25-10030 – Relo
513 N 89TH PL · PMT26-11622
Enclose an existing carport at existing SFR with Concrete Masonry Unit (CMU) walls with openings to install three windows, two walk-in doors, and a garage door. Minimum required building inspections: Framing, drywall fire assembly and final.
2047 W 3RD ST · PMT26-11148
Similar Electrical Permits
electrical
Norfolk, VA · E26-03186
electrical
Norfolk, VA · E26-03183
electrical
Norfolk, VA · E26-03130
Upgrade existing main service panel to 200A like for like. Minimum required building inspections: Electric rough in and electric final.
Mesa, AZ · PMT26-17008
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Mesa, AZ · PMT26-17818
About Electrical Permits in Mesa, AZ
What is a Electrical permit?
A Electrical permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.