PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
2328 S SORRELLE, Mesa, AZ
Permit Details
- Permit Number
- PMT26-12753
- Type
- Electrical
- Status
- issued
- Issued Date
- July 28, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Fria Valencia
About Electrical Permits in AZ
0
Electrical permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
This project involves the "as-builting" of an existing condition and non-permitted construction that was executed by the previous building owner that subdivided an existing office suite into 2 separate suites that share the same electrical service. There is no "new" work anticipated outside of adding a security key box outside of the suites to allow access to the shared electrical panel as allowed by NEC 240.24(b) and approved by Mr. Chris Clark.
931 E SOUTHERN AVE 209 · PMT26-03161
Landsea Homes #35-2100 Master plan for new 2725 S.F. single-family home construction. New water and electric meters. Special inspections required for post-installed anchors in PT slab and Special Inspection Certificate for Unconfirmed Energy Report Requirements. Truss Calcs deferred. Addenda MST24-21772 - modifications insulation blown in cellulose, vent calculating to reflect the correct number of vents, removed additional attic scuttle/access from garage, structural and mechanical revisions.
8944 E COVINA ST · PMT25-19931
Community Residence registration: Assisted Living Home for 6-10 residents. Sprinkered (in the process of installation)
9804 E SPEED AVE · PMT26-03109
Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be required. A written scope of work is required to approximate the cost of the permit, verbal estimations shall not be used. This structure is to be restored like for like in compliance with 2017 NEC, 2018 IRC/IBC requirements. Any alterations or changes will require submitting plan
307 W 9TH PL N · PMT26-03679
Similar Electrical Permits
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE TESLA POWERWALL3 EXPANSION UNIT. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESU
Mesa, AZ · PMT26-12579
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Mesa, AZ · PMT26-12723
Installation of 20-amp circuit breaker at Main Electric Panel for three exterior GFCI receptacles for BBQ area. Electrical to comply with 2023 NEC requirements and SRP standards. This permit does not include any accessory structures. Light gauge, pre-manufactured metal patio covers and awnings are exempt from building permit but not from zoning ordinance requirements. Maintain a min of 2-ft from overhang to the property lines to comply.
Mesa, AZ · PMT26-12726
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND DERATE MAIN BREAKER TO 175AMP. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN
Mesa, AZ · PMT26-12828
Upgrade existing 200A SES to new 400A SES Underground service.
Mesa, AZ · PMT26-12176
About Electrical Permits in Mesa, AZ
What is a Electrical permit?
A Electrical permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.