single_family_(detached)C of o issued

Landsea Homes #35-2100 Master plan for new 2725 S.F. single-family home construction. New water and electric meters. Special inspections required for post-installed anchors in PT slab and Special Inspection Certificate for Unconfirmed Energy Report Requirements. Truss Calcs deferred. Addenda MST24-21772 - modifications insulation blown in cellulose, vent calculating to reflect the correct number of vents, removed additional attic scuttle/access from garage, structural and mechanical revisions.

8944 E COVINA ST, Mesa, AZ

Permit Details

Permit Number
PMT25-19931
Type
single_family_(detached)
Status
c of o issued
Issued Date
July 28, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
CHELSEA MARTOCCIA

About single_family_(detached) Permits in AZ

0

single_family_(detached) permits in AZ

Other Permits in Mesa, AZ

New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi

3101 E ELMWOOD ST · PMT25-23465

This project involves the "as-builting" of an existing condition and non-permitted construction that was executed by the previous building owner that subdivided an existing office suite into 2 separate suites that share the same electrical service. There is no "new" work anticipated outside of adding a security key box outside of the suites to allow access to the shared electrical panel as allowed by NEC 240.24(b) and approved by Mr. Chris Clark.

931 E SOUTHERN AVE 209 · PMT26-03161

Community Residence registration: Assisted Living Home for 6-10 residents. Sprinkered (in the process of installation)

9804 E SPEED AVE · PMT26-03109

Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be required. A written scope of work is required to approximate the cost of the permit, verbal estimations shall not be used. This structure is to be restored like for like in compliance with 2017 NEC, 2018 IRC/IBC requirements. Any alterations or changes will require submitting plan

307 W 9TH PL N · PMT26-03679

Installation of two illuminated wall signs on a halo illuminated cabinet with illuminated pan channel letters each sign to be a total of 68 sq ft HONOR HEALTH. A sign on west and north elevations. total combined sign area 136 sqft. Signs shall be installed per NEC 2023 with UL listed components.

6811 E SUPERSTITION SPRINGS BLVD · PMT26-02665

Similar single_family_(detached) Permits

New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi

Mesa, AZ · PMT25-23465

SHEA HOMES #5016 - NEW 3505 SF TWO STORY RESIDENCE WITH A 3 CAR GARAGE AT AVALON CROSSING. INCLUES MANY ELEVATION OPTIONS. NEW WATER, ELECTRIC AND GAS METERS. Addenda per MST25-12445. Revised and added sheets for foundation slab depth for phase 2 foundations. SPECIAL INSPECTION FOR POST TENSION SLABS.

Mesa, AZ · PMT25-19967

New single-story 3-bedroom 2.5-bathroom custom home. 1766 SF livable and 857 SF non-livable area consisting of garage and covered patios. Type V-B construction. Existing sewer. Existing 3/4-inch water meter. New 200 amp electrical panel with meter. New gas meter. Deferred truss calculations. No special inspections. Minimum required inspections: Plumbing underground, footing, stem, strap/shear, frame, electric rough in, plumbing rough in, insulation, drywall shear, electric final, plumbing final,

Mesa, AZ · PMT26-12428

Install an electrical line from the electric box on the south side of home through the attic and down the garage wall to accommodate a new mini-split system on the north side of the house.

Mesa, AZ · PMT26-12815

LANDSEA HOMES #35-2300 - RIALTA - Master plan for new 2897 S.F. single-family home construction. New water and electric meters. Special inspections required for post-installed anchors in PT slab and Special Inspection Certificate for Unconfirmed Energy Report Requirements. Truss Calcs deferred. Addenda MST24-21773 - modifications insulation blown in cellulose, vent calculating to reflect the correct number of vents, removed additional attic scuttle/access from garage, structural and mechanical

Mesa, AZ · PMT25-08077

About single_family_(detached) Permits in Mesa, AZ

What is a single_family_(detached) permit?

A single_family_(detached) permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.