PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
8056 E MADERO AVE, Mesa, AZ
Permit Details
- Permit Number
- PMT26-11349
- Type
- Electrical
- Status
- c of c issued
- Issued Date
- July 17, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Fria Valencia
About Electrical Permits in AZ
0
Electrical permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
New 2166 SF single story residence with a 2+ car garage at Hawes Crossing. New water, gas and electric meters. Special inspection for post tension slabs - SEE ADDENDA MST25-07603 - Ref: MST26-08010 for 2024 code update.
3840 S GLADIOLUS CIR · PMT26-18354
THIS PROJECT IS A CHANGE OF OCCUPANCY ONLY. THE SPACE IS CURRENTLY DESIGNATED A 'B' OCCUPANCIES HOWEVER IT WAS ORIGINALLY CONSTRUCTED UNDER PERMIT # 51525 AS A RETAIL SALES BUILDING. THERE ARE NO CHANGES TO THE EXISTING SPACE. THIS SUBMITTAL IS ONLY DOCUMENTAION OF EXISTING CONDITIONS. AS CURRENTLY CONFIGURED, THE SPACE MEETS THE REQUIREMENTS OF THE CURRENT ZONING AND ADOPTED CODES INCLUDING ADA COMPLIANCY. NO ADDITIONAL WORK IS PLANNED.
156 S MESA DR · PMT26-18351
Adding a 50 amp circuit for a car charger. I will install the circuit back-to-back from the main electrical panel in the garage. I am also installing the charger.
11540 E REUBEN AVE · PMT26-18355
NEW 1970 SF SINGLE STORY RESIDENCE WITH 2+ CAR GARAGE IN HAWES CROSSING. INCLUDES NEW WATER, GAS AND ELECTRIC METER. SPECIAL INSPECTIONS FOR POST TENSION SLABS. ADDENDA MST22-18751 - PARCEL ADDITION, SHEET S1.01 ADDED PARCEL H INFORMATION: · REVISED GEOTECHNICAL REPORT DATES: SHEETS S1.07 -S1.12 - ADDED SHEETS FOR 9 1/2" FOUNDATION FOR PARCEL F. Ref: MST26-07852 for 2024 code update.
7911 E RENATA AVE · PMT26-18350
Similar Electrical Permits
electrical
Norfolk, VA · E26-02702
Adding a 50 amp circuit for a car charger. I will install the circuit back-to-back from the main electrical panel in the garage. I am also installing the charger.
Mesa, AZ · PMT26-18355
Install of a 50 amp sub panel to a existing shed.
Mesa, AZ · PMT26-18202
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
Mesa, AZ · PMT26-12700
Extension of existing circuit from house to pergola to control lighting and fan. No special inspections. Minimum required building inspections: Electric rough in and electric final.
Mesa, AZ · PMT26-13520
About Electrical Permits in Mesa, AZ
What is a Electrical permit?
A Electrical permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.