PermitDig
ElectricalIssued

Building Permit

514 VIRGINIA AVENUE, Norfolk, VA

$66

Estimated Value

Permit Details

Permit Number
E26-02702
Type
Electrical
Status
issued
Issued Date
October 12, 2026
County
Norfolk, VA
View on county site

Parties

No contractor listed

About Electrical Permits in VA

1,537

Electrical permits in VA

$112

Average estimated value

Similar Electrical Permits

Adding a 50 amp circuit for a car charger. I will install the circuit back-to-back from the main electrical panel in the garage. I am also installing the charger.

Mesa, AZ · PMT26-18355

Install of a 50 amp sub panel to a existing shed.

Mesa, AZ · PMT26-18202

PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR

Mesa, AZ · PMT26-12700

Extension of existing circuit from house to pergola to control lighting and fan. No special inspections. Minimum required building inspections: Electric rough in and electric final.

Mesa, AZ · PMT26-13520

PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES

Mesa, AZ · PMT26-16940

About Electrical Permits in Norfolk, VA

What is a Electrical permit?

A Electrical permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Norfolk, VA, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Norfolk, VA's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.