PermitDig
ElectricalC of c issued

PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AN

954 W KEATING AVE, Mesa, AZ

Permit Details

Permit Number
PMT26-05808
Type
Electrical
Status
c of c issued
Issued Date
April 27, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
Janelin Franco

About Electrical Permits in AZ

0

Electrical permits in AZ

Similar Electrical Permits

Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.

Mesa, AZ · PMT26-10978

Install and wire sub panel at 90A in existing RV garage to power additional circuits, run conduit and wire additional circuits

Mesa, AZ · PMT26-10013

PERMIT IS ONLY FOR INSTALLATION OF THREE SIGENSTOR 9.0 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES A

Mesa, AZ · PMT26-09798

PERMIT IS ONLY FOR INSTALLATION OF TWO SOLAR EDGE HOME BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES A

Mesa, AZ · PMT26-00009

PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE

Mesa, AZ · PMT26-11706

About Electrical Permits in Mesa, AZ

What is a Electrical permit?

A Electrical permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.