PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND TWO POWERWALL 3 EXPANSION UNITS. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT I
3633 S PAYTON, Mesa, AZ
Permit Details
- Permit Number
- PMT26-05193
- Type
- Electrical
- Status
- issued
- Issued Date
- March 31, 2026
- County
- Mesa, AZ
Parties
- Contractor
- Tesla
About Electrical Permits in AZ
0
Electrical permits in AZ
Other Permits in Mesa, AZ
New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi
3101 E ELMWOOD ST · PMT25-23465
Hawes Crossing Village 4 is a part of the Hawes Crossing master planned community located northeast quarter of Section 20, Township 1 South, Range 7 East of the Gila and Salt River Meridian. The Project is comprised of approximately 39 net acres planned for single family residential development. Approved with comments. Landscape meter included in Phase 1 under PMT25-03485.
8235 E WARNER RD · PMT26-10351
Install one Non Illuminated Monument Sign PECOS CROSSING. 42.50 sq ft.
7021 S SOSSAMAN RD · PMT26-09619
INSTALLATION OF 12-FT11-IN OF 1.2-IN PE GAS LINE BURIED 18-IN WITH 18 GAUGE TRACER WIRE FROM EXISTING 3.4-IN GAS STUB TO 38K BTU GRIDDLE & 8-FT OF1.2-IN PE GAS LINE TO 31K BTU GRILL. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED.
5448 S BOCA · PMT26-10730
Group M occupancy. Type II-B construction. 3,000 SF. Occupant load 42. Demo marked portion of demising wall to give space to adjacent suite. Demo storefront system, storefront column, partition walls, plumbing fixtures, floor drains, electrical panel, portion of slab for electrical trenching, soffit and columns, existing RTUs, mechanical ducting, electrical lighting, and ceiling. New 1-hr rated demising wall at storage area. New partition walls to create storage area, ADA compliant restroom, and
1854 S VAL VISTA DR 103 · PMT26-07960
Similar Electrical Permits
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
Mesa, AZ · PMT26-12700
Extension of existing circuit from house to pergola to control lighting and fan. No special inspections. Minimum required building inspections: Electric rough in and electric final.
Mesa, AZ · PMT26-13520
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Mesa, AZ · PMT26-16940
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF
Mesa, AZ · PMT26-17272
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Mesa, AZ · PMT26-17402
About Electrical Permits in Mesa, AZ
What is a Electrical permit?
A Electrical permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.
Where does this data come from?
This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.